Demolition Notes (NOT ALL. USED REFER TO PLANS) q
<br /> ±12 a O.A.L_
<br /> F-A-IT
<br /> 7.0 DEMOLITION:
<br /> 1.1 PRINCIPAL WORK IN THIS SECTION
<br /> A. COMPLETELY DEMOLISH EXISTING CONSTRUCTION WHERE INDICATED BY DASHED LINES
<br /> ANDIOR SPECIFIC NOTES ON THE DRAWINGS AND REQUIRED BY JOB CONDITIONS. Q 14
<br /> B. PROTECT EXISTING CONSTRUCTION DESIGNATED TO REMAIN.
<br /> C. REMOVE DEMOLISHED ITEMS FROM THE SITE AND DISPOSE OF THEM IN A LEGAL MANNER. (�
<br /> 1.2 RELATED WORK 1N OTHER SECTIONS u`IIY
<br /> A. DISCONNECTING, CUTTING, CAPPING OR RELOCATING ANY ACTIVE UTILITY LINES
<br /> ENCOUNTERED(INCLUDING: LANDSCAPE IRRIGATION,TELEPHONE,GAS&ELECTRIC
<br /> SERVICE LINES)
<br /> 1.3 REFERENCE STANDARDS - 1
<br /> A. ANSI A10.6 "SAFETY REQUIREMENTS FOR DEMOLITION"PUBLISHED BY THE AMERICAN
<br /> NATIONAL STANDARDS INSTITUTE.
<br /> 1.4 PROTECTION
<br /> A. CEASE OPERATIONS AND IMMEDIATELY NOTIFY THE ARCHITECT&OWNER IF THE SAFETY
<br /> OF EXISTING CONSTRUCTION APPEARS TO BE ENDANGERED AT ANY TIME.TAKE
<br /> PRECAUTIONS TO SUPPORT SUCH ENDANGERED CONSTRUCTION AND DO NOT RESUME
<br /> OPERATIONS UNTIL AUTHORIZED BY THE OWNER. 1 1
<br /> 2.0 EXECUTION: ARCHITECT
<br /> 2.1 OWNERSHIP OF DEMOLISHED MATERIALS
<br /> A. ALL DEMOLISHED MATERIALS SHALL BECOME THE CONTRACTOR'S PROPERTY TO DISPOSE SCOTT GIBSON ARCHITECT INC,
<br /> OF TO HIS BEST ADVANTAGE. 2
<br /> B. REMOVE DEMOLISHED MATERIALS FROM THE SITE AND DISPOSE OF THEM IN A LEGAL 2540 ZANELLA WAY, SUITE#60
<br /> MANNER. NO ON-SITE SALE, BURYING OR BURNING OF DEMOLISHED MATERIALS WILL BE CH ICO, CA 95928
<br /> PERMITTED- FI:FE z R P: 530 / 343-7557
<br /> 2.2 PERFORMANCE OF WORK F: 530 / 343-7447
<br /> A. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE ADEQUACY AND INSTALLATION
<br /> OF ALL TEMPORARY SHORING SYSTEMS USED DURING THE REMOVAL OF ALL
<br /> STRUCTURAL ELEMENTS.
<br /> B. NO EXISTING STRUCTURAL ELEMENT(BEAM, COLUMN, SHEAR WALL,ETC.)SHALL BE
<br /> p ARc
<br /> REMOVED UNLESS CONTRACTOR IS PREPARED TO BEGIN INSTALLATION OF A NEW 4 /
<br /> STRUCTURAL ELEMENT AT THE TIME OF REMOVAL OF THE EXISTING ELEMENT, EXCEPT AS
<br /> OTHERWISE AGREED BY THE BUILDING DEPARTMENT AND THE ARCHITECT. SCOT G.
<br /> C. THE DRAWINGS DO NOT NECESSARILY INDICATE THE FULL_EXTENT OF THE WORK * GIB N
<br /> REQUIRED TO BE PERFORMED. INSPECT THE EXISTING CONSTRUCTION CAREFULLY TO t O.
<br /> DETERMINE THE FULL EXTENT OF WORK TO BE PERFORMED AND THE PROBLEMS N
<br /> I ! 5 � n' 2� N .. 1- -1
<br /> INVOLVED. NO EXTRA COMPENSATION WILL BE ALLOWED BECAUSE OF FAILURE TO fl/ f/ O
<br /> ESTIMATE THE FULL EXTENT OTF THE WORK OR ANY CONTINGENCIES IN CONNECTION Lu y 7
<br /> THERE WITH. I
<br /> D. ALL WORK SHALL BE PERFORMED BY SKILLED AND PROPERLY EQUIPPED PERSONNEL. / D J N I (S;
<br /> DEMOLITION AND REMOVAL OF ITEMS SCAFFOLD HIGH OR HIGHER SHALL BE SLOWED BY
<br /> CONTROLLED METHODS,NOT BY THROWING OR DROPPING. PERFORM CUTTING AND COOL E R z �
<br /> STRIPPING SO THAT THE WORK TO REMAIN IS UNDAMAGED AND IN SUCH MANNER THAT
<br /> NEW WORK CAN BE PROPERLY CONNECTED WITH IT.
<br /> 2.3 METHODS �- REVISIONS
<br /> A. DEMOLISH EXISTING CONSTRUCTION ONLY TO THE EXTENT NECESSARY FOR THE PROPER
<br /> INSTALLATION OF NEW CONSTRUCTION AND JUNCTION WITH EXISTING WORK. CUT BACK a PLAN
<br /> FINISHED SURFACES TO STRAIGHT, PLUMB AND LEVEL LINES AS REQUIRED. 4 CHECK A05/06/2016
<br /> B. PROCEDURE � 3 � >< I � T �
<br /> REVDATE:
<br /> 1. SAWING: Q
<br /> f I I REVDATE:
<br /> A. SAWING SHALL BE PERFORMED BY EXPERIENCED CRAFTSMEN CUSTOMARILY ENGAGED IN ELEC. PANELS
<br /> AND PROPERLY EQUIPPED FOR THE PERFORMANCE OF THE TYPE OF WORK REQUIRED BYmo
<br /> ±
<br /> JOB CONDITIONS. +i /13 3 S Q.
<br /> T. REVDATE:
<br /> B. PROVIDE WET VACUUM EQUIPMENT AS REQUIRED FOR CONTROL OF WASTE COOLING
<br /> WATER.
<br /> 2
<br /> 2.4 DEMOLITION FOR INSTALLATION OF PIPING CONDUIT ETC. lic
<br /> REVDATE:
<br /> A. REMOVE EXISTING CONSTRUCTION FOR INSTALLATION OF PIPING,CONDUIT AND TUBING
<br /> AS REQUIRED BY MECHANICAL,PLUMBING AND ELECTRICAL TRADES. a I I
<br /> B. EXCEPTION: DRILLLING AND INSTALLING SLEEVES FOR PASSAGE OF PIPING,CONDUIT pC I f I REVDATE:
<br /> AND TUBING SHALL BE DONE BY THE TRADE INSTALLING THE PIPING,CONTUIT OR TUBING. EMPLOYEE
<br /> CAREFULLY INVESTIGATE AND EXPLORE THE LOCATION OF HIDDEN SERVICES,BY LOUNGE CORRIDOR 0
<br /> POT-HOLING AND/OR PROPERLY&CAUTIOUSLY EXPOSING SERVICES. I I I
<br /> 2.5 DAMAGE AND REPAIR OFF I CE: 11 1 I I -mold
<br /> A. REPAIR, RESTORE, REPLACE OR MAKE GOOD DAMAGE TO EXISTING CONSTRUCTION
<br /> THE WHICH EBURS AS A RESULT OF DEMOLITION OPERATIONS AT NO ADDITIONAL COST TO 2 1r� �O� � N Cj _ _ _ _ r L I I
<br /> TOIL.E:T , 11
<br /> 2.6 CLEANUP 2 \ II
<br /> A. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON THE PREMISES. PROVIDE II
<br /> FOR THE CONTINUOUS REMOVAL AND LEGAL OFF SITE DISPOSAL OF DEMOLISHED ♦ I I
<br /> MATERIALS AS THE WORK PROGRESSES. ti
<br /> 3.0 DEMOLITION AND PREPARATION _ \ 12 F = = — — 2
<br /> 1.0 GENERAL L 1 12 1-1 E:N',5
<br /> 1 3
<br /> 1.1 SCOPE. FURNISH EQUIPMENT AND PERFORM LABOR REQUIRED TO EXECUTE THIS WORK AS 1Q� 11 \` TOILET
<br /> INDICATED ON THE DRAWINGS AS SPECIFIED AND AS NECESSARY TO COMPLETE THE \
<br /> CONTRACT, INCLUDING,BUT NOT LIMITED TO,THESE MAJOR ITEMS: LaoA. PROTECTION OF EXISTING WORK TO REMAIN. STORAGE _ rt
<br /> B. REMOVAL OF NON-STRUCTURAL PARTITIONS ,WALL FINISHES, BUILDING INSULATION, AREA 2 11 + I I f I 1 1
<br /> FLOOR FINISHES, INTERIOR DROPPED SOFFITS,SUSPENDED CEILINGS, FLOOR COVERING, !I I I [ _
<br /> CEILINGS,AND INTERIOR DRYWALL.
<br /> 1.3 GENERAL REQUIREMENTS \ II I I > m
<br /> A. FIELD CONDITIONS:TAKE INTO CONSIDERATION AS NECESSARY WORK ALL OBVIOUS I I 1 1 f 3
<br /> EXISTING CONDITIONS AND INSTALLATIONS ON THE SITE AS THOUGH THEY WERE 1 12` I I q
<br /> COMPLETELY SHOWN OR DESCRIBED. ACCEPT THE SITE OF THE WORK AS IT EXISTS AND 1 I
<br /> CLEAR OBSTRUCTIONS TO THE WORK INDICATED. ,f '
<br /> B. ALL CONTRACTORS&SUBCONTRACTORS SUBMITTING PROPOSALS FOR THIS WORK
<br /> SHALL FIRST EXAMINE THE SITE AND ALL CONDITIONS AND LIMITATIONS THEREON AND
<br /> THEREABOUTS. ALL PROPOSALS SHALL TAKE INTO ACCOUNT ALL SUCH CONDITIONS AND 1�
<br /> LIMITATIONS WHETHER OR NOT THE SAME ARE SPECIFICALLY SHOWN OR MENTIONED IN iJ l
<br /> ANY OF THESE DOCUMENTS AND EVERY PROPOSAL SHALL BE CONSTRUED AS INCLUDING �R
<br /> WHATEVER SUMS ARE NEEDED TO COMPLETE THE WORK IN EVERY PART AS SHOWN, V J
<br /> DESCRIBED OR REASONABLY REQUIRED OR IMPLIED,AND ATTAIN THE COMPLETED
<br /> CONDITIONS CONTEMPLATED BY THE CONTRACTOR.
<br /> C. CODES: PERFORM ALL WORK IN ACCORDANCE WITH THE BUILDING CODE OF THE
<br /> GOVERNING BODY HAVING JURISDICTION,THE GOVERNING STATE INDUSTRIAL SAFETY
<br /> ORDERS AND THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT. #-1--F
<br /> D. UNFORESEEN CONDITIONS: INCLUDE IN THE BASE BID MISCELLANEOUS CUTTING AND
<br /> PATCHING NECESSITATED ASA RESULT OF UNFORESEEN CONDITIONS AND THE Existing / D e m o Iti o n - Floor Pian �
<br /> REWORKING OF ABUTTING SURFACES AS REQUIRED TO MAKE NEW WORK JOIN AND
<br /> MATCH EXISTING SURFACES TO REMAIN. NO EXTRA PAYMENTS BASED ON THE PLEA OF
<br /> UNFORESEEN CONDITIONS WILL BE ALLOWED. SCALE. 1/4" = V-0„
<br /> E. NOISE CONTROL: CONDUCT ALL WORK IN A MANNER WHICH WILL PRODUCE THE LEAST
<br /> AMOUNT OF NOISE. INSTRUCT ALL WORKMEN IN NOISE CONTROL PROCEDURES.
<br /> 2.0 EXECUTION Keyed Notes Legend Z
<br /> z 2.1 PROTECTION O
<br /> A- LOWERING MATERIAL: PROVIDE HOISTS AND CHUTES AS REQUIRED TO LOWER REMOVED
<br /> J ❑ (E) EXTERIOR 2x BUILDING WALLIS
<br /> CL MATERIAL. THROWING, DROPPING OR PERMITTING THE FREE FALL OF MATERIAL AND 1 - TO REMAIN UNCHANGED PER PLAN, TYPICAL
<br /> OY DEBRIS FROM HEIGHTS WHICH WOULD CAUSE DAMAGE TO WORK TO REMAIN,UNDUE CE) INTERIOR 2x BUILDING WALL'S
<br /> O NOISE OR NUISANCE,OR EXCESSIVE DUST IS EXPRESSLY PROHIBITED,
<br /> O B. PROTECTION OF PERSONNEL: ERECT SIGNS,BARRICADES AND SUCH OTHER FORMS OF 2 - TO REMAIN UNCHANGED PER PLAN, TYPICAL - - - - - - - - DEMOLITION
<br /> !Ji WARNING AS MAY BE REQUIRED TO PREVENT PERSONNEL FROM PUTTING THEMSELVES IN (E) DOOR AND FRAME Z
<br /> cel THE WAY OF INJURY. D - TO REMAIN UNCHANGED PER PLAN, TYPICAL00 0
<br /> C. EXISTING WORK TO REMAIN: PROVIDE SUCH FORMS OF PROTECTION AS MAY BE ® — — — DEMOLITION 2 X W,4LLS
<br /> C:) CE) STOREFRONT WINDOW SYSTEM � _ _ — — — � ,
<br /> NECESSARY TO PREVENT DAMAGE TO EXISTING WORK AND EQUIPMENT TO REMAIN. - TO REMAIN UNCHANGED PER PLAN, TYPICAL
<br /> �I (PROTECTIVE BARRICADES)
<br /> ❑ (E) BUILDING FLOOR FINISH / SLAB
<br /> 2.2 GENERAL DEMOLITION
<br /> CD A. DOORS AND HARDWARE: REMOVE CAREFULLY TO AVOID DAMAGE. INSOFAR AS - TO REMAIN UNCHANGED PER PLAN, TYPICAL ` DEMOLITION DOOR FRAME
<br /> / II FRME /
<br /> Q (E) SUSPENDED CEILING / GYPSUM CEILING _ tC STOREFRONT WINDOW SYSTEM
<br /> POSSIBLE,LEAVE HARDWARE ATTACHED TO THE DOOR. WHERE THIS IS NOT PRACTICAL, - TO REMAIN UNCHANGED PER PLAN, TYPICAL
<br /> c PLACE ITEMS OF THE HARDWARE IN A CLOTH BAG ATTACHED TO THE DOOR. ❑ �
<br /> � B. PARTITIONS: REMOVE PARTITION FINISH, STUDS, PLATES AND SILLS, WHERE ONLY A (E) DRIVE TNRU WINDOWS PARTIAL RUN IS REMOVED,CUT BACK FINISH MATERIAL TO THE CENTER LINE OF THE - TO REMAIN UNCHANGED PER PLAN, TYPICAL EXISTING O
<br /> 01 NEXT ADJACENT SUPPORT TO REMAIN. LEAVE REMAINING MATERIAL WITH A CLEAN ❑ (E) ROOF OVERHANG
<br /> C14C) TERMINAL LINE WITH NO LOOSE MATERIAL ADHERING. 8 - TO REMAIN UNCHANGED PER PLAN, TYPICAL
<br /> o0
<br /> C:),( 2.3 MECHANICAL, ELECTRICAL, AND PLUMBING AS OCCURS DEMO (E) URINAL
<br /> Q A. CAREFULLY REVIEW PLANS AND DETERMINE LINES TO BE REMOVED AND THOSE TO BE ❑ - PATCH AND REPAIR FLOORING AND WALL A5 REO'D. SEAL AND GAP PLUM6IN6 EXISTING 2X WALLS z —1
<br /> UI KEPT ACTIVE OR TO BE REACTIVATED. PROTECT LINES TO REMAIN, PROVIDE FOR DEMO (E) TOILET - LL
<br /> MINIMUM SERVICE INTERRUPTION OF LINES TO REMAIN. - PATCH AND REPAIR FLOORING AND WALL A5 REO D, SEAL AND GAP PLJJNBING
<br /> O B. REMOVE FIXTURES AND EQUIPMENT AS INDICATED. WHEN INDICATED FOR REUSE,CLEAN, / EXISTING DOOR FRAME /
<br /> w STORE AS DIRECTED AND PROTECT. IDENTIFY POINT OF REUSE. 11 DEMO (E) INTERIOR 2x BUILDING WALLS STOREFRONT LUINDOLU SYSTEM .`
<br /> C. REMOVE LINES COMPLETELY WHEREVER POSSIBLE. CUT AND CAP OR PLUG IN A POSITIVE ❑ - DEMO WALL'5 PER PLAN, PATCH AND REPAIR TO MATCH ADJACENT CONDITIOW, TYP.
<br /> am MANNER BEHIND THE BACK OF FINISH MATERIAL. DEMO (E) DOOR AND DOOR FRAME X
<br /> EZ 2.4 REMOVE MATERIAL AND DEBRIS 12 - DEMO DOOR AND DOOR FRAME PER PLAN, TYPICAL
<br /> A. ALL REMOVED MATERIAL, NOT OTHERWISE DESIGNATED,AND ALL DEBRIS BECOMES THE EXISTING SRIGK W,4LL
<br /> < Y 13 DEMO (E) STOREFRONT WINDOW SYSTEM
<br /> c\I4 PROPERTY OF THE CONTRACTOR WHO SHALL REMOVE IT FROM THE SITE. - DEMO 5TOREFRONT WINDOW 5Y5TEM, INFILL PER {M FLOOR PLAN A1.1 TYPICAL
<br /> B. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO 1� DEMO (E) ROOF OVERNANC
<br /> m ACCUMULATE. REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER. REFER TO 5HEET AIA FOR ROOF DEMO DETAILS AND LOCATION5, TYPICAL
<br /> CD C. LEAVE ALL SPACES BROOM CLEAN WITH ALL LEDGES AND CORNERS PROPERLY CLEANED.
<br /> a
<br /> 2.5 FLOOR FINISHES 15 (E) ROOF ACCESS LADDER
<br /> CI A. REMOVE EXISTING FLOOR FINISHES AND PREPARE SUB-SURFACE TO RECEIVE NEW ❑ - TO REMAIN UNCHANGED PER PLAN, TYPICAL DATE_ 12/02/2015
<br /> FLOOR AS INDICATED(SEE FINISH SCHEDULE). WORK SHALL BE ACCEPTABLE TO THE
<br /> N L0 POINT THAT THE FINISH WILL ACCEPT VINYL TILE WITH NO NOTICEABLE ALTERATION 16 - JOB N O. 15-086
<br /> p O HAVING BEEN MADE. PROVIDE CONCRETE TOPPING WHERE REQUIRED. (SLAB SHALL BE 1� -
<br /> >, N SMOOTH AND LEVEL TO 118"IN 10'-0"IN ANY DIRECTION. -
<br /> t[3
<br /> U
<br /> U
<br /> O
<br /> LAl
<br /> . 0
<br /> U- 0
<br /> ALL DRAWINGS&WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT&THE SAME MAY NOT BE DUPLICATED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT.COPYRIGHT"SCOTT GIBSON ARCHITECTS"ALL RIGHTS RESERVED.