Laserfiche WebLink
Demolition Notes (NOT ALL. USED REFER TO PLANS) q <br /> ±12 a O.A.L_ <br /> F-A-IT <br /> 7.0 DEMOLITION: <br /> 1.1 PRINCIPAL WORK IN THIS SECTION <br /> A. COMPLETELY DEMOLISH EXISTING CONSTRUCTION WHERE INDICATED BY DASHED LINES <br /> ANDIOR SPECIFIC NOTES ON THE DRAWINGS AND REQUIRED BY JOB CONDITIONS. Q 14 <br /> B. PROTECT EXISTING CONSTRUCTION DESIGNATED TO REMAIN. <br /> C. REMOVE DEMOLISHED ITEMS FROM THE SITE AND DISPOSE OF THEM IN A LEGAL MANNER. (� <br /> 1.2 RELATED WORK 1N OTHER SECTIONS u`IIY <br /> A. DISCONNECTING, CUTTING, CAPPING OR RELOCATING ANY ACTIVE UTILITY LINES <br /> ENCOUNTERED(INCLUDING: LANDSCAPE IRRIGATION,TELEPHONE,GAS&ELECTRIC <br /> SERVICE LINES) <br /> 1.3 REFERENCE STANDARDS - 1 <br /> A. ANSI A10.6 "SAFETY REQUIREMENTS FOR DEMOLITION"PUBLISHED BY THE AMERICAN <br /> NATIONAL STANDARDS INSTITUTE. <br /> 1.4 PROTECTION <br /> A. CEASE OPERATIONS AND IMMEDIATELY NOTIFY THE ARCHITECT&OWNER IF THE SAFETY <br /> OF EXISTING CONSTRUCTION APPEARS TO BE ENDANGERED AT ANY TIME.TAKE <br /> PRECAUTIONS TO SUPPORT SUCH ENDANGERED CONSTRUCTION AND DO NOT RESUME <br /> OPERATIONS UNTIL AUTHORIZED BY THE OWNER. 1 1 <br /> 2.0 EXECUTION: ARCHITECT <br /> 2.1 OWNERSHIP OF DEMOLISHED MATERIALS <br /> A. ALL DEMOLISHED MATERIALS SHALL BECOME THE CONTRACTOR'S PROPERTY TO DISPOSE SCOTT GIBSON ARCHITECT INC, <br /> OF TO HIS BEST ADVANTAGE. 2 <br /> B. REMOVE DEMOLISHED MATERIALS FROM THE SITE AND DISPOSE OF THEM IN A LEGAL 2540 ZANELLA WAY, SUITE#60 <br /> MANNER. NO ON-SITE SALE, BURYING OR BURNING OF DEMOLISHED MATERIALS WILL BE CH ICO, CA 95928 <br /> PERMITTED- FI:FE z R P: 530 / 343-7557 <br /> 2.2 PERFORMANCE OF WORK F: 530 / 343-7447 <br /> A. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE ADEQUACY AND INSTALLATION <br /> OF ALL TEMPORARY SHORING SYSTEMS USED DURING THE REMOVAL OF ALL <br /> STRUCTURAL ELEMENTS. <br /> B. NO EXISTING STRUCTURAL ELEMENT(BEAM, COLUMN, SHEAR WALL,ETC.)SHALL BE <br /> p ARc <br /> REMOVED UNLESS CONTRACTOR IS PREPARED TO BEGIN INSTALLATION OF A NEW 4 / <br /> STRUCTURAL ELEMENT AT THE TIME OF REMOVAL OF THE EXISTING ELEMENT, EXCEPT AS <br /> OTHERWISE AGREED BY THE BUILDING DEPARTMENT AND THE ARCHITECT. SCOT G. <br /> C. THE DRAWINGS DO NOT NECESSARILY INDICATE THE FULL_EXTENT OF THE WORK * GIB N <br /> REQUIRED TO BE PERFORMED. INSPECT THE EXISTING CONSTRUCTION CAREFULLY TO t O. <br /> DETERMINE THE FULL EXTENT OF WORK TO BE PERFORMED AND THE PROBLEMS N <br /> I ! 5 � n' 2� N .. 1- -1 <br /> INVOLVED. NO EXTRA COMPENSATION WILL BE ALLOWED BECAUSE OF FAILURE TO fl/ f/ O <br /> ESTIMATE THE FULL EXTENT OTF THE WORK OR ANY CONTINGENCIES IN CONNECTION Lu y 7 <br /> THERE WITH. I <br /> D. ALL WORK SHALL BE PERFORMED BY SKILLED AND PROPERLY EQUIPPED PERSONNEL. / D J N I (S; <br /> DEMOLITION AND REMOVAL OF ITEMS SCAFFOLD HIGH OR HIGHER SHALL BE SLOWED BY <br /> CONTROLLED METHODS,NOT BY THROWING OR DROPPING. PERFORM CUTTING AND COOL E R z � <br /> STRIPPING SO THAT THE WORK TO REMAIN IS UNDAMAGED AND IN SUCH MANNER THAT <br /> NEW WORK CAN BE PROPERLY CONNECTED WITH IT. <br /> 2.3 METHODS �- REVISIONS <br /> A. DEMOLISH EXISTING CONSTRUCTION ONLY TO THE EXTENT NECESSARY FOR THE PROPER <br /> INSTALLATION OF NEW CONSTRUCTION AND JUNCTION WITH EXISTING WORK. CUT BACK a PLAN <br /> FINISHED SURFACES TO STRAIGHT, PLUMB AND LEVEL LINES AS REQUIRED. 4 CHECK A05/06/2016 <br /> B. PROCEDURE � 3 � >< I � T � <br /> REVDATE: <br /> 1. SAWING: Q <br /> f I I REVDATE: <br /> A. SAWING SHALL BE PERFORMED BY EXPERIENCED CRAFTSMEN CUSTOMARILY ENGAGED IN ELEC. PANELS <br /> AND PROPERLY EQUIPPED FOR THE PERFORMANCE OF THE TYPE OF WORK REQUIRED BYmo <br /> ± <br /> JOB CONDITIONS. +i /13 3 S Q. <br /> T. REVDATE: <br /> B. PROVIDE WET VACUUM EQUIPMENT AS REQUIRED FOR CONTROL OF WASTE COOLING <br /> WATER. <br /> 2 <br /> 2.4 DEMOLITION FOR INSTALLATION OF PIPING CONDUIT ETC. lic <br /> REVDATE: <br /> A. REMOVE EXISTING CONSTRUCTION FOR INSTALLATION OF PIPING,CONDUIT AND TUBING <br /> AS REQUIRED BY MECHANICAL,PLUMBING AND ELECTRICAL TRADES. a I I <br /> B. EXCEPTION: DRILLLING AND INSTALLING SLEEVES FOR PASSAGE OF PIPING,CONDUIT pC I f I REVDATE: <br /> AND TUBING SHALL BE DONE BY THE TRADE INSTALLING THE PIPING,CONTUIT OR TUBING. EMPLOYEE <br /> CAREFULLY INVESTIGATE AND EXPLORE THE LOCATION OF HIDDEN SERVICES,BY LOUNGE CORRIDOR 0 <br /> POT-HOLING AND/OR PROPERLY&CAUTIOUSLY EXPOSING SERVICES. I I I <br /> 2.5 DAMAGE AND REPAIR OFF I CE: 11 1 I I -mold <br /> A. REPAIR, RESTORE, REPLACE OR MAKE GOOD DAMAGE TO EXISTING CONSTRUCTION <br /> THE WHICH EBURS AS A RESULT OF DEMOLITION OPERATIONS AT NO ADDITIONAL COST TO 2 1r� �O� � N Cj _ _ _ _ r L I I <br /> TOIL.E:T , 11 <br /> 2.6 CLEANUP 2 \ II <br /> A. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON THE PREMISES. PROVIDE II <br /> FOR THE CONTINUOUS REMOVAL AND LEGAL OFF SITE DISPOSAL OF DEMOLISHED ♦ I I <br /> MATERIALS AS THE WORK PROGRESSES. ti <br /> 3.0 DEMOLITION AND PREPARATION _ \ 12 F = = — — 2 <br /> 1.0 GENERAL L 1 12 1-1 E:N',5 <br /> 1 3 <br /> 1.1 SCOPE. FURNISH EQUIPMENT AND PERFORM LABOR REQUIRED TO EXECUTE THIS WORK AS 1Q� 11 \` TOILET <br /> INDICATED ON THE DRAWINGS AS SPECIFIED AND AS NECESSARY TO COMPLETE THE \ <br /> CONTRACT, INCLUDING,BUT NOT LIMITED TO,THESE MAJOR ITEMS: LaoA. PROTECTION OF EXISTING WORK TO REMAIN. STORAGE _ rt <br /> B. REMOVAL OF NON-STRUCTURAL PARTITIONS ,WALL FINISHES, BUILDING INSULATION, AREA 2 11 + I I f I 1 1 <br /> FLOOR FINISHES, INTERIOR DROPPED SOFFITS,SUSPENDED CEILINGS, FLOOR COVERING, !I I I [ _ <br /> CEILINGS,AND INTERIOR DRYWALL. <br /> 1.3 GENERAL REQUIREMENTS \ II I I > m <br /> A. FIELD CONDITIONS:TAKE INTO CONSIDERATION AS NECESSARY WORK ALL OBVIOUS I I 1 1 f 3 <br /> EXISTING CONDITIONS AND INSTALLATIONS ON THE SITE AS THOUGH THEY WERE 1 12` I I q <br /> COMPLETELY SHOWN OR DESCRIBED. ACCEPT THE SITE OF THE WORK AS IT EXISTS AND 1 I <br /> CLEAR OBSTRUCTIONS TO THE WORK INDICATED. ,f ' <br /> B. ALL CONTRACTORS&SUBCONTRACTORS SUBMITTING PROPOSALS FOR THIS WORK <br /> SHALL FIRST EXAMINE THE SITE AND ALL CONDITIONS AND LIMITATIONS THEREON AND <br /> THEREABOUTS. ALL PROPOSALS SHALL TAKE INTO ACCOUNT ALL SUCH CONDITIONS AND 1� <br /> LIMITATIONS WHETHER OR NOT THE SAME ARE SPECIFICALLY SHOWN OR MENTIONED IN iJ l <br /> ANY OF THESE DOCUMENTS AND EVERY PROPOSAL SHALL BE CONSTRUED AS INCLUDING �R <br /> WHATEVER SUMS ARE NEEDED TO COMPLETE THE WORK IN EVERY PART AS SHOWN, V J <br /> DESCRIBED OR REASONABLY REQUIRED OR IMPLIED,AND ATTAIN THE COMPLETED <br /> CONDITIONS CONTEMPLATED BY THE CONTRACTOR. <br /> C. CODES: PERFORM ALL WORK IN ACCORDANCE WITH THE BUILDING CODE OF THE <br /> GOVERNING BODY HAVING JURISDICTION,THE GOVERNING STATE INDUSTRIAL SAFETY <br /> ORDERS AND THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT. #-1--F <br /> D. UNFORESEEN CONDITIONS: INCLUDE IN THE BASE BID MISCELLANEOUS CUTTING AND <br /> PATCHING NECESSITATED ASA RESULT OF UNFORESEEN CONDITIONS AND THE Existing / D e m o Iti o n - Floor Pian � <br /> REWORKING OF ABUTTING SURFACES AS REQUIRED TO MAKE NEW WORK JOIN AND <br /> MATCH EXISTING SURFACES TO REMAIN. NO EXTRA PAYMENTS BASED ON THE PLEA OF <br /> UNFORESEEN CONDITIONS WILL BE ALLOWED. SCALE. 1/4" = V-0„ <br /> E. NOISE CONTROL: CONDUCT ALL WORK IN A MANNER WHICH WILL PRODUCE THE LEAST <br /> AMOUNT OF NOISE. INSTRUCT ALL WORKMEN IN NOISE CONTROL PROCEDURES. <br /> 2.0 EXECUTION Keyed Notes Legend Z <br /> z 2.1 PROTECTION O <br /> A- LOWERING MATERIAL: PROVIDE HOISTS AND CHUTES AS REQUIRED TO LOWER REMOVED <br /> J ❑ (E) EXTERIOR 2x BUILDING WALLIS <br /> CL MATERIAL. THROWING, DROPPING OR PERMITTING THE FREE FALL OF MATERIAL AND 1 - TO REMAIN UNCHANGED PER PLAN, TYPICAL <br /> OY DEBRIS FROM HEIGHTS WHICH WOULD CAUSE DAMAGE TO WORK TO REMAIN,UNDUE CE) INTERIOR 2x BUILDING WALL'S <br /> O NOISE OR NUISANCE,OR EXCESSIVE DUST IS EXPRESSLY PROHIBITED, <br /> O B. PROTECTION OF PERSONNEL: ERECT SIGNS,BARRICADES AND SUCH OTHER FORMS OF 2 - TO REMAIN UNCHANGED PER PLAN, TYPICAL - - - - - - - - DEMOLITION <br /> !Ji WARNING AS MAY BE REQUIRED TO PREVENT PERSONNEL FROM PUTTING THEMSELVES IN (E) DOOR AND FRAME Z <br /> cel THE WAY OF INJURY. D - TO REMAIN UNCHANGED PER PLAN, TYPICAL00 0 <br /> C. EXISTING WORK TO REMAIN: PROVIDE SUCH FORMS OF PROTECTION AS MAY BE ® — — — DEMOLITION 2 X W,4LLS <br /> C:) CE) STOREFRONT WINDOW SYSTEM � _ _ — — — � , <br /> NECESSARY TO PREVENT DAMAGE TO EXISTING WORK AND EQUIPMENT TO REMAIN. - TO REMAIN UNCHANGED PER PLAN, TYPICAL <br /> �I (PROTECTIVE BARRICADES) <br /> ❑ (E) BUILDING FLOOR FINISH / SLAB <br /> 2.2 GENERAL DEMOLITION <br /> CD A. DOORS AND HARDWARE: REMOVE CAREFULLY TO AVOID DAMAGE. INSOFAR AS - TO REMAIN UNCHANGED PER PLAN, TYPICAL ` DEMOLITION DOOR FRAME <br /> / II FRME / <br /> Q (E) SUSPENDED CEILING / GYPSUM CEILING _ tC STOREFRONT WINDOW SYSTEM <br /> POSSIBLE,LEAVE HARDWARE ATTACHED TO THE DOOR. WHERE THIS IS NOT PRACTICAL, - TO REMAIN UNCHANGED PER PLAN, TYPICAL <br /> c PLACE ITEMS OF THE HARDWARE IN A CLOTH BAG ATTACHED TO THE DOOR. ❑ � <br /> � B. PARTITIONS: REMOVE PARTITION FINISH, STUDS, PLATES AND SILLS, WHERE ONLY A (E) DRIVE TNRU WINDOWS PARTIAL RUN IS REMOVED,CUT BACK FINISH MATERIAL TO THE CENTER LINE OF THE - TO REMAIN UNCHANGED PER PLAN, TYPICAL EXISTING O <br /> 01 NEXT ADJACENT SUPPORT TO REMAIN. LEAVE REMAINING MATERIAL WITH A CLEAN ❑ (E) ROOF OVERHANG <br /> C14C) TERMINAL LINE WITH NO LOOSE MATERIAL ADHERING. 8 - TO REMAIN UNCHANGED PER PLAN, TYPICAL <br /> o0 <br /> C:),( 2.3 MECHANICAL, ELECTRICAL, AND PLUMBING AS OCCURS DEMO (E) URINAL <br /> Q A. CAREFULLY REVIEW PLANS AND DETERMINE LINES TO BE REMOVED AND THOSE TO BE ❑ - PATCH AND REPAIR FLOORING AND WALL A5 REO'D. SEAL AND GAP PLUM6IN6 EXISTING 2X WALLS z —1 <br /> UI KEPT ACTIVE OR TO BE REACTIVATED. PROTECT LINES TO REMAIN, PROVIDE FOR DEMO (E) TOILET - LL <br /> MINIMUM SERVICE INTERRUPTION OF LINES TO REMAIN. - PATCH AND REPAIR FLOORING AND WALL A5 REO D, SEAL AND GAP PLJJNBING <br /> O B. REMOVE FIXTURES AND EQUIPMENT AS INDICATED. WHEN INDICATED FOR REUSE,CLEAN, / EXISTING DOOR FRAME / <br /> w STORE AS DIRECTED AND PROTECT. IDENTIFY POINT OF REUSE. 11 DEMO (E) INTERIOR 2x BUILDING WALLS STOREFRONT LUINDOLU SYSTEM .` <br /> C. REMOVE LINES COMPLETELY WHEREVER POSSIBLE. CUT AND CAP OR PLUG IN A POSITIVE ❑ - DEMO WALL'5 PER PLAN, PATCH AND REPAIR TO MATCH ADJACENT CONDITIOW, TYP. <br /> am MANNER BEHIND THE BACK OF FINISH MATERIAL. DEMO (E) DOOR AND DOOR FRAME X <br /> EZ 2.4 REMOVE MATERIAL AND DEBRIS 12 - DEMO DOOR AND DOOR FRAME PER PLAN, TYPICAL <br /> A. ALL REMOVED MATERIAL, NOT OTHERWISE DESIGNATED,AND ALL DEBRIS BECOMES THE EXISTING SRIGK W,4LL <br /> < Y 13 DEMO (E) STOREFRONT WINDOW SYSTEM <br /> c\I4 PROPERTY OF THE CONTRACTOR WHO SHALL REMOVE IT FROM THE SITE. - DEMO 5TOREFRONT WINDOW 5Y5TEM, INFILL PER {M FLOOR PLAN A1.1 TYPICAL <br /> B. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO 1� DEMO (E) ROOF OVERNANC <br /> m ACCUMULATE. REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER. REFER TO 5HEET AIA FOR ROOF DEMO DETAILS AND LOCATION5, TYPICAL <br /> CD C. LEAVE ALL SPACES BROOM CLEAN WITH ALL LEDGES AND CORNERS PROPERLY CLEANED. <br /> a <br /> 2.5 FLOOR FINISHES 15 (E) ROOF ACCESS LADDER <br /> CI A. REMOVE EXISTING FLOOR FINISHES AND PREPARE SUB-SURFACE TO RECEIVE NEW ❑ - TO REMAIN UNCHANGED PER PLAN, TYPICAL DATE_ 12/02/2015 <br /> FLOOR AS INDICATED(SEE FINISH SCHEDULE). WORK SHALL BE ACCEPTABLE TO THE <br /> N L0 POINT THAT THE FINISH WILL ACCEPT VINYL TILE WITH NO NOTICEABLE ALTERATION 16 - JOB N O. 15-086 <br /> p O HAVING BEEN MADE. PROVIDE CONCRETE TOPPING WHERE REQUIRED. (SLAB SHALL BE 1� - <br /> >, N SMOOTH AND LEVEL TO 118"IN 10'-0"IN ANY DIRECTION. - <br /> t[3 <br /> U <br /> U <br /> O <br /> LAl <br /> . 0 <br /> U- 0 <br /> ALL DRAWINGS&WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT&THE SAME MAY NOT BE DUPLICATED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT.COPYRIGHT"SCOTT GIBSON ARCHITECTS"ALL RIGHTS RESERVED. <br />