My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
14900
>
3600 - Recreational Health Program
>
PR0536403
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:22 PM
Creation date
3/29/2022 8:14:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3600 - Recreational Health Program
File Section
WORK PLANS
RECORD_ID
PR0536403
PE
3612
FACILITY_ID
FA0000527
FACILITY_NAME
Yogi Bear's Jellystone Park
STREET_NUMBER
14900
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242-9514
APN
055-030-15
CURRENT_STATUS
01
SITE_LOCATION
14900 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK — SPA REVISIONS By <br /> Drain Spa <br /> Strip Plaster to Substrate <br /> Reconfigure Entry Way Steps <br /> Top Step Tread to be 21"-24" <br /> [ L J 2nd and 3rd Step Tread to be 12" <br /> Step Risers to be of Equal Height <br /> Shown in Detail D4 <br /> G <br /> OInstall Trim Tile on Shallow End Steps and Benches <br /> 2x2 Black, Flush with Plaster, Slip-Resistant <br /> Shown in Detail D2 <br /> - 6 D8Cq <br /> o a <br /> Install 2 New Hand Rails at Shallow End Stairs <br /> Install Commercial 3-Bend Rail re, <br /> ._. <br /> 4 }Min. 28'in Height from Deck and stairs <br /> Non-Corrosive p4 tial, Bonded <br /> Shown In Detai • o <br /> c <br /> �,•� ate♦ � OO <br /> Main Drain <br /> A • <br /> V v ♦,, ,,� Split Drains to 36"Apart With 3" PVC at the "T" <br /> Install Aquastar 32"Channel Drain Cover <br /> 7 5 D6 own in Detail D6 <br /> CU� <br /> CD <br /> TJet Suction <br /> r Split Drains to 36"Apart With 3" PVC at the "T" <br /> r �oc� moo <br /> Install Aquastar 32" Channel Drain Cover <br /> Shown in Detail D6 <br /> 1 U L c 1 <br /> 1 ! <br /> 1 ! <br /> ♦ice ft��♦ 1 7 Prep and Plaster Spa with Premium White Altima Quartz Finish <br /> 40 ft ft * What is going to be done to the equalizers? <br /> � 140 loo ♦♦ 40:0'♦ <br /> 180 ♦I♦♦ r♦♦ <br /> I � <br /> I � <br /> I � <br /> r � <br /> 5K <br /> 3 � Y2i . i ■ FD4 2 �..i �, ■ SO NO DIVING 4 D4 <br /> OUTLET DM <br /> COVER ■ ' ■ RMANUFACTURED r <br /> SPA SPECIFICATIONS <br /> HR HR <br /> [32"TCHp <br /> iCSurface Area–44 Sq Ft <br /> Perimeter-23.5 Ft ILLI <br /> Volume– 1,155 Gallons W l) <br /> Unbfackable' <br /> Turnover rate @ 30 min =38.5 GPM IO <br /> itpr,,)p nd [o <br /> .1 .r.�tp rf��� n <br /> a m <br /> a ,, <br /> EXISTING EQUIPMENT Z <br /> Z <br /> Uj <br /> �. Note. Spa Equipment is Existing, Installed b Others. 1110 Q <br /> y Z o � � <br /> Changes to Equipment are Included In Scope of Work by � O <br /> Burkett s Pool Plastering at Time of Contract Signing. <br /> LA- ?: CV C <br /> ..0 u7 <br /> 4. SPA 07 <br /> I �'�<<�t r wt �l� �rit,.,r: FILTER–TR60 Sand Filter co C)7i O CL Z Q co <br /> PUMP–Pentair VS{Potential 135 GPM @ 60 TDH} <br /> l 1 r JET PUMP–Pentair VS(Potential LU L � U O <br /> I: <br /> - Hydrostatic Relief ( tial i 35 GPM @ 40 TDH} N � <br /> SANIT ZER–Rolochem Liquid Chlorine C5 <br /> rn :� c <br /> i FLOW METER– Blue White <br /> o j- 0 <br /> 6&1 <br /> SPLIT 36"APART FLOW METER READING– 100 GPM = f— r-- .J (/} <br /> - � - <br /> Contrasting `� " <br /> Mm.28 in MEASURED FROM SUCTION PIPE SIZE (Main Drain}–2 <br /> SteplBench Trim Tile Max 36 in ' ' ° � <br /> ti L::4 ;, ; ., 1, ;_ � .... 3 in . EDGE OF COVERS � , ',.. Q � E (Skimmer)–2 <br /> SUCTION PIPE SI r <br /> Plaster Finish —� ,�- Per Finish Shedule <br /> RETURN PIPE SIZE <br /> ., I: , - JET SUCTION PIPE SIZE–2" <br /> �VBA4L:C:;1:}I;w JET SUCTION RETURN PIPE SIZE–21' Date 5/10/2021 <br /> ih.ii I A".6- <br /> U(11-L •.a.•.1r a+r E E Scale 1 <br /> -- <br /> ---- ; Main Drain Jet Suction LEGEND = FT <br /> E Jet Suction <br /> 4, c c <br /> _ <br /> E E Drawn <br /> BAL <br /> By <br /> ab <br /> 3iiAF = Automatic Fill Device <br /> Y aster Finish Job TOWER PARK <br /> , .. .r DM - Depth Marker Name RESORT - CBS <br /> i - — <br /> ....., <br /> r :� r r.,,«._w,u PVC SL., n... G R – G Rail l <br /> 12m 12 in 2124 \ <br /> Job <br /> 2`Tapeiea T-tended P:ie F uy Oty-r = - tab 122094 <br /> 9.Pial Div tict � I � � � <br /> I - , a 31'C f,3rrnr:ClrA f)p A%ret$n e.1 O HR _ Number <br /> 3: Cha.�rrm Qra n rf,sh Cover <br /> Hand Rail <br /> Hand and Rail is constructed NEW M <br /> cted with anon-corrosive material 1 MAIN DRAIN COVERS Y SK <br /> �. n„:�a'Fiat Heid Ph iiu3 311.1 mss. ars �, ANTI-HAIR ENTRAPMENT, Skimmer <br /> ANTIVORTEX VGB APPROVED Sheet# 1 <br /> VC�13 2a13(m ipliwlr�t :a:.ar 4r n i.1r 1 Sr•arhx Tr:F.-Romnvin A rx{ijrjtF raa;k-,ArI.11rat Ir <br /> CONTRASTING NOSING TILE UL - Underwater Light <br /> °2 <br /> CONTR `� HAND RAIL/STEP <br /> SPLIT DRAINS - POOL Of 1 Sheets <br />
The URL can be used to link to this page
Your browser does not support the video tag.