Laserfiche WebLink
CHANNEL <br /> DRAIN <br /> Rk IL GRATE <br /> Y k RAP <br /> OUTLET COVER <br /> AND <br /> i THREE-PORT AYRD P SCOPE OF WORK — <br /> SPA REVISIONS BY <br /> Y ► WQ <br /> Y. Yj L2 <br /> r <br /> �NtAI�ON <br /> EM What is going to be done to the equalizers? Drain Spa <br /> FFATi PF 1 C 1 0 (�)Strip Plaster to Substrate <br /> I <br /> Unblockable.t <br /> . <br /> Reconfigure Entry Way Steps <br /> SK <br /> i 2 2nd and 3rd Step Tread to be 12 <br /> T Top Step Tread to be 21"-24" <br /> r O <br /> Step Risers to be of Equal Height <br /> Shown in Detail D4 <br /> • Install Trim Tile on Shallow End Steps and Benches <br /> 3 2x2 Black, Flush with Plaster Slip-Resistant <br /> p Stant <br /> Shown in Detail D2 ^� °+'0110 ft Aft 4V ' <br /> 5'r1t 'f'�r•;]3 ti. ♦� i ♦♦ l iii <br /> 40 0 <br /> j 40 <br /> 0 0 <br /> o 0. '40�— 5 D fi o �k <br /> t ' ' Install 2 New Hand Rails at a. <br /> i u� ♦ Shallow End Stairs C,, 4, <br /> Install Commercial 3-Bend a <br /> Min. 28""in Height from Deck and stairs • `- o <br /> I , , Non-Corrosive Material Bonded • <br /> r� <br /> • Shown In Detail D4 0 <br /> Q <br /> Ep Main Drain <br /> .'c l3 i eL'r' f Drains are Split to 36"Apart With 3" PVC at the "T" <br /> r _ 1 <br /> a -w-----------,.---- ti r 1 Instal! New Aquastar 32"I Channel Drain Cover <br /> ' Shown in Detail D6 <br /> � r <br /> i <br /> r <br /> r r Jet Suction <br /> i <br /> Drains are Split to 36"Apart With 3" PVC at the "T" <br /> ��0 # Install New Aquastar 32" Channel Drain Cover <br /> i <br /> r <br /> 1 Shown in Detail D6 <br /> KV, f f r��irr-f�,7ir��d'u;�;e.�r:,r 6 <br /> 1 _ # <br /> 6 D <br /> 2' Tat:el8d Tnle:'K3e3? ir f ug Oty? <br /> r: t al 3.P::fiDiv jel r <br /> 4 i r, r II <br /> 3E d nri Ura rl F" L.rr ti r # — <br /> i <br /> f r r) <br /> 't:"Cl,aane'Dr.)n f;r.s:h raver <br /> 1C x 34'Flal,Hcad Pts lips. 316 55.oly <br /> I, <br /> �y. I x <br /> 7 Prep and Plaster Spa with Premium White Altima Quartz Finish <br /> 'C�13 �7+?$C c-]friE)�l.3tJt F a:ar'�F r y ars.,r'awx Tr.F,>Ficmztwr.A>"n r.�rlta�PlacFar A�hr.ainr r 1 <br /> c.C= • =C_5 1 <br /> II <br /> CD � <br /> ' I <br /> 1 r <br /> 1 r <br /> r r <br /> 1 r <br /> 1 r <br /> Contrasting I 1 <br /> —Step/Bench Trim Tile <br /> Plaster Finish- I Per Finish SheduleJ. <br /> ' r <br /> ' r <br /> 1 r <br /> # � r <br /> 1 <br /> c # i r <br /> r r <br /> It <br /> 1 <br /> 1 <br /> # ♦r What is this drain for? <br /> 1 r 1 <br /> # ♦ <br /> f � <br /> Plaster Finish I <br /> f • <br /> # CD , <br /> D2 <br /> CONTRASTING NOSING TILE • <br /> SPA SPECIFICATIONS <br /> # 7 r <br /> # � r <br /> ! <br /> Min281n ' U) <br /> r Surface Area- 129 Sq Ft V) <br /> , <br /> f Max 3fi in # Peri meter-45.5 Ft W <br /> — r <br /> � 1 <br /> D3 3 ` Volume-2,895 Gallons CU <br /> cl ♦ � # Turnover rate @ 30 rain =96.5 GPM d Q <br /> r W <br /> r <br /> 00 <br /> EXISTING EQUIPMENT O <br /> LU rn <br /> Note: Spa Equipment is Existing, Installed by Others. No Q CV <br /> + Changes to Equipment are Included In Scope of Work by <br /> ~--~ ♦ Z O r <br /> .�...12 M. }2 in. 21_24 in. �`, 1, , ♦ ,, <br /> 40 Burkett>s Pool Plastering at Time of Contract Signing. W O O <br /> Hand Rail is constructed with a non-corrosive material �� ♦ _ . <br /> SPA .C)) C- <br /> �� i ti� ���� FILTER-TR140 Sand Filter <br /> ♦ PUMP-Pentair VS(Potential 135 GPM @ 60 TDH) = U 0 <br /> HAND RAIL/STEP � JET PUMP-Pentair VS Potential 135 W '- o <br /> ( GPM @ 40 TDH) Q} ^7 <br /> Hydrostatic Relief r SANITIZER-Rolochem Liquid Chlorine O 6 <br /> FLOW METER- Blue White 0 O <br /> HR t r FLOW METER READING-100 GPM = -- t-- J (f) <br /> 1 * SUCTION PIPE SIZE (Main Drain)-3" <br /> r r <br /> SPLIT 36"APART - 1 I SUCTION PIPE; SIZE (Skimmer)-3"' <br /> O O <br /> MEASURED FROM � r <br /> EDGE OF COVERS fl I RETURN PIPE SIZE-3" ) <br /> f JET SUCTION PIPE SIZE-3" <br /> # # <br /> r JET SUCTION RETURN PIPE SIZE-3" Date 5/10/2021 <br /> D4 2 <br /> Main Drain Jet Suction <br /> E E Jet Suction Scale 1" = I FT <br /> .E LEGEND E <br /> Drawn <br /> HR oM By BAL <br /> = Automatic Fill Device Job TOWER PARK <br /> What is going to be done to the equalizers? AF DM - Depth Marker Name RESORT - CBS <br /> 0 0 o sK GR - Grab Rail <br /> NEW MAIN DRAIN COVERS <br /> Job <br /> Number 122095 <br /> r HR — Hr`I, nCl Rail <br /> --- ANTI-HA#R ENTRAPMENT, <br /> ANTIVORTEX VGB APPROVED <br /> SK – Skimmer <br /> Sheet# 1 <br /> D6 SPLIT DRAINS - POOL UL - Underwater Light <br /> —.� Of 1 Sheets <br />