My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014549
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
680
>
2600 - Land Use Program
>
SU-87-02
>
SU0014549
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2022 1:42:39 PM
Creation date
3/29/2022 1:34:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014549
PE
2600
FACILITY_NAME
SU-87-02
STREET_NUMBER
680
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
APN
19512012
ENTERED_DATE
12/7/2021 12:00:00 AM
SITE_LOCATION
680 E LATHROP RD
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br />3 <br />4 <br />N7 <br />g. The public sanitary sewer and water systems shall be pro- <br />vided by the developer and served by the Lathrop County <br />Water District. All required sanitary sewer and water <br />system improvements shall be conveyed to the District upon <br />completion and acceptance by the County. <br />h. A terminal drainage system shall be provided to meet the <br />requirements of the County and to provide adequate <br />drainage for the development. The use of the Louise <br />Avenue terminal line shall be supplemented with detention <br />ponds. A master storm drainage plan with detention ponds <br />shall be prepared by the developer for the Lathrop area to <br />serve the undeveloped parcels. Said master plan shall be <br />approved by the County and incorporated into the improve- <br />ment plans prior to the approval of the improvement plans <br />and the Final Map. The developer shall agree to pay his <br />proportionate share of the Lathrop Area of Benefit No. 6 <br />drainage fees. <br />i. Street lighting shall be provided for the interior streets <br />within the development and along the frontages of Lathrop <br />Road and Fifth Street development. <br />j. The property shall annex to County Service Area No. 4 <br />(Zone A) and the Lathrop Lighting District prior to accep- <br />tance of the Final Map to provide for the operation and <br />maintenance of storm drainage and street lighting facili- <br />ties, respectively. <br />k. The developer shall agree to and shall pay service fees <br />for the street lighting and storm drainage services from <br />the time the improvements are accepted by the County to <br />the end of the Fiscal Year, or up to a one (1) year <br />period, as the case may be. <br />1. All utilities shall be underground. <br />m. A grading plan shall be prepared as part of the improve- <br />ment plans. <br />Local Health District: <br />Connection to an approved public water supply and public <br />water system is required. <br />Lathrop County Water District: <br />If the lot yield exceeds the sewer allocation as determined <br />by the assessment proceedings, the subdivider must pay the <br />excess charges as stated in the District's sewer connection <br />fee schedule. <br />Pacific Gas & Electric Company: <br />Ten -foot -wide public utility easements shall be provided on <br />all street frontages within the subdivision and shall be <br />dedicated when the final map is filed. <br />Conditions of Approval - 2 - <br />SU -87-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.