Laserfiche WebLink
SAN 10AOUIN COMMUNITY DEVELOPMENT DEPARTMENT <br /> COUNTY SITE APPROVAL/USE PERMIT <br /> FILE NUMBER: <br /> Airport Land Use Commission <br /> Within an Airport Includes structure over 200 = <br /> Area of Influence? Yes❑ No❑� feet in height? Yes❑ No ALUC fees paid? Yes❑ No❑ <br /> OPERATIONS <br /> Employees/Customers/Deliveries per Work Shift <br /> Attach additional sheets as necessary) <br /> Average Average Average <br /> Days of Number of Employees Number of Customers Deliveries/ Seasonal <br /> Shift# Shift Hours Operation Per Shift per Shift Shipments per Shift Or Year- <br /> Existing Proposed Existing Proposed Existing Proposed round? <br /> #1 8 M,T,W,T 4 4 75 150 2 2 May-Sep <br /> #2 8 M,T,W,T 3 3 40 80 2 2 Apr&Oct <br /> #3 8 M,T,W,T 0 0 0 0 0 0 Nov-Mar <br /> #1.4 8 F,S,S 10 14 400 600 4 5 May-Sep <br /> Surface Transportation Assistance Act(STAA) <br /> Will STAA type trucks,over California Legal length,be used as part of the proposed operation? Existing route:Yes❑ No❑ <br /> Yes❑ No❑E <br /> Note:Contact the Department of Public Works for information regarding STAA routes at 209-468-3000 <br /> Buildings and Structures <br /> (This information must be shown on the Site Plan) <br /> Structure Square <br /> Number(as Number Total Square <br /> Proposed Use(s) Footage per Building Height Occupancy <br /> shown on of Floors Floor Footage <br /> siteplan) <br /> Additional information,including <br /> Previously Approved Permit Nos <br /> in Section 4 and expanded <br /> answers, are in our DCCE <br /> Attachment A-Executive <br /> Summary/Project Description <br /> On-Site Parking <br /> Full-size Parking Compact Parking ADA Parking Total Parking <br /> Spaces Number Spaces Number Number Space Number <br /> Existing Proposed Existing Proposed Existing Proposed Existing Proposed <br /> N/A N/A N/A N/A <br /> Page 2 of 6 <br /> 08/13/2021 <br />