Laserfiche WebLink
Hazardous Waste Tank Assessment January 21,2022 <br /> Central Valley Waste Services Project No.1246 <br /> Lodi,CA Page 2 <br /> 1"diameter solid welded type"L"copper pipe. The copper pipe runs along the outside of <br /> the sheet metal vehicle maintenance facility, then penetrates the wall and connects to <br /> portable drain pans filled with used oil. The AST has the following fittings on top, as <br /> shown on the design drawing provided in Attachment A: <br /> ➢ One 4" in primary tank with spillbox for manual filling. <br /> ➢ One 2"port in primary tank(electrical) <br /> ➢ One 2"port in primary tank(fill port via 1" copper pipe) <br /> ➢ Four 2"ports in primary tank(blank). <br /> ➢ One 2"port in primary tank with 90-degree camlock fitting (tank effluent) <br /> ➢ Two 6"ports in primary tank(one blank, one vent). <br /> ➢ One 6"port in secondary containment (emergency vent). <br /> ➢ One 2"monitoring port in secondary containment. <br /> ➢ One 2" in secondary containment (electrical for monitoring probe) <br /> • Description of any external and internal pumps {22 CCR §66265.192(k)(2)(d)} <br /> Graco model Husky 1040 double diaphragm pneumatic pump, design flow 40 gpm. The <br /> pump is located inside the maintenance facility. <br /> • Sketch or drawing of tank including dimensions {22 CCR §66265.192(k)(2)(e)} <br /> See design drawing (Attachment A) and photographs of the tank system(Attachment B) <br /> • Documented age of the tank system, if available 122 CCR §66265.192(k)(3)1 <br /> The tank is approximately 20 years old. <br /> • Description and evaluation of any leak detection equipment 122 CCR §66265.192(k)(4) <br /> The interstitial space is monitored through a 2" diameter port that accesses the annular <br /> space between the primary and secondary tanks. An electronic probe at the bottom of the <br /> annular space will detect leakage from the primary tank and send an audible alarm to the <br /> Husky 007 tank monitoring system inside the maintenance facility. The audible alarm was <br /> tested during the inspection and found to be properly operating. <br /> • Description and evaluation of any corrosion protection, equipment, devices, or material <br /> {22 CCR §66265.192(k)(5)1: <br /> The outside of the AST is in good condition and factory coated with an epoxy coated finish <br /> to prevent oxidation. The paint coating is in fair condition with a few minor rust spots in <br /> places on the sides of the tank. The tank is in a covered wash bay and is not in direct <br /> contact with soil or precipitation. The tank is adequately protected from corrosion. The <br /> primary tank and secondary tanks are constructed of 10-gauge mild steel. It is not possible <br /> to evaluate corrosion of the primary tank since it is enclosed within the secondary tank, <br /> thus no evaluation could be made with respect to corrosion of the primary tank. <br /> • Description and evaluation of spill prevention and overfill equipment {22 CCR <br /> §66265.192(k)(6)1 <br /> The Husky 007 level gauge monitors the liquid level within the primary tank such that an <br /> audible alarm sounds inside the Maintenance building if the tank exceeds 80%of maximum <br /> capacity. The A spill kit is in the maintenance facility. <br /> • Description and evaluation of secondary containment for the tank system and ancillary <br />