My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:06:49 PM
Creation date
4/12/2022 10:19:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231923
PE
2361 - UST FACILITY
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1617 W FREMONT ST STOCKTON 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed byManufacturer ✓ Industry Standard Professional Engineer <br /> Test Type HPressure ✓ Vacuum I JHydrostatic <br /> Test Equipment Used:vacuum Gauge <br /> Tank ID e7-1 e7-2 91 <br /> Tank Manufacturer Xerxes Xerxes xerces <br /> Tank Capacity 12000 12000 12000 <br /> Test Start Time 7:4SAM 8:ooAM 8:0SAM <br /> Initial Reading -10psi -10psi -10psi <br /> Test End Time 8:45AM 9:OOAM 9:05AM <br /> Final Reading -10psi -10psi -10psi <br /> Change in Reading Opsi opsi opsi <br /> Pass/Fail Criteria +/- opsi +/- opsi +/- opsi <br /> Tightness Test Results ✓ Pas Fail ,/ Pass Fail pass Fail Pass Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by I Manufacturer ✓ Industry Standard Professional Engineer <br /> Test Type v( Pressure Vacuum Hydrostatic <br /> Test Equipment Used:Pressure Gauge <br /> Pipe Run ID 97-1 Product e7-2 Product 91 Product <br /> Pipe Manufacturer Ameron Ameron Amercn <br /> Test Start Time 9:50AM 7:50AM a-10AM <br /> Initial Reading 5psi 5psi 5psi <br /> Test End Time 10:50AM 8:50AM 9:10AM <br /> Final Reading 5psi 5pei 5psi <br /> Change in Reading opsi Opsi opsi <br /> Pass/Fail Criteria +/- opsi +/- opsi +/- opsi <br /> Tightness Test ResultsIF,/-]Pass Fil <br /> aPass Fail ✓ Pass ail 11 jPassjFail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results I JPassjFail Pass ail 11 jPassFjFail IF— jPasq IFail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.