Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by L Manufacturer Industry Standard L Professional Engineer <br /> Test Type Pressure L vacuum 2/ Hydrostatic <br /> Test Equipment Used:TS-STS <br /> SumplUDC ID 87-1 STP 87-2 STP 91 STP 67-1 Fill <br /> Sump Manufacturer Xerxes Xerxes Xerxes Xerxes <br /> Sump Depth (inches) 46" 46" 45" 46" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 27" 29" 24" 19" <br /> (inches) <br /> Test Start Time 9:51AM 9:5 1M 10.06AM 7:24AM <br /> Initial Reading 2.8463" 2.3539" 1.0161" 2.3169" <br /> Test End Time 10.06AM la:06AM 10:25AM 7:40AM <br /> Final Reading 2.8465" 2.3543" 1.0167" 2.3163" <br /> Change in Reading 0.0002" 0.0004" 0.0006" 0.0006" <br /> Pass/Fail Criteria +/- 0.002" +/- 0.002« +/- 0.002" +/- 0.002" <br /> Tightness Test Results ZPass Fail Pass Fail r/ Pass Fail � Pass Fail <br /> SumplUDC 1D 87-2 Fill 91 Fill 1/2 3/4 <br /> Sump Manufacturer Xerxes Xerxes Bravo Bravo <br /> Sump Depth (inches) 46 1/2" 46" 31" 31" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 19., 19" 15" 15" <br /> (inches) <br /> Test Start Time 7:24AM 7:24AM 11:28AM 11:28AM <br /> Initial Reading 5.1473" 4.1610" 2.5187" 3.0227" <br /> Test End Time 7:40AM 7:40AM 11:43AM 11.43AM <br /> Final Reading 5.1475" 4.1805" 2.5177" 3.0219" <br /> Change in Reading 0.0002" 0.0002" 0.0010" 0.0006" <br /> ass/ ail Criteria +/- 0.002" +/- 0.002" +/- 0.002" +/- 0.002" <br /> Tightness Test Results ZPass Fail ZPass Fail �/ Pass Fail ZPass Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />