My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:06:49 PM
Creation date
4/12/2022 10:19:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231923
PE
2361 - UST FACILITY
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1617 W FREMONT ST STOCKTON 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMPIUDC TEST (continued) <br /> Test Method Developed by L Manufacturer jv(I Industry Standard 0 Professional Engineer <br /> Test Type Pressure vacuum v( Hydrostatic <br /> Test Equipment Used:TS-STS <br /> Sump/UDC ID 5/6 7/6 <br /> Sump Manufacturer Bravo Brava <br /> Sump Depth (inches) 30" 31" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 1s" 1s" <br /> (inches) <br /> Test Start Time 11:28AN 11.28AN <br /> Initial Reading 4.6831" 1.9256" <br /> Test End Time 11:43AM 11.43AN <br /> Final Reading 4.6016" 1.9256" <br /> Change in Reading 0.0015" On <br /> Pass/Fail Criteria 0.002" 0.002" <br /> Tightness Test Results r/ PassFail ZpassLjFail Pass FailPass Fail <br /> Sump1UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> } (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results Pass Fail Pass Fail ass ail Pass Fail <br /> Additional copies of this page may be attached. <br /> All tests marked"Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.