Laserfiche WebLink
Policies and SUBJECT PAGE <br /> Procedures Stockton Hazardous Work Policy 2 of is <br /> Examples of potential tasks and relative need for issuing of a Hazardous Work Permit: <br /> Description of Hazardous Work Location Permit Reg' <br /> Remove and replace hot oil rotary Machine line, Filler Yes <br /> unions tower <br /> Remove and replace asphalt, HTF, Still yard,machine line, Yes <br /> or adhesive pumps, valves, <br /> and gauges. <br /> Sample collection of HTF Still yard Yes <br /> Cleaning/Changing Side Stream Still yard Yes <br /> Oil Filters <br /> Draining of Vat and/or Filters or Blend, Machine Line Yes <br /> Use tanks. <br /> Blowing back HTF to Expansion All Areas Yes <br /> Tank <br /> Draining of the Storage tanks Still Yard Yes <br /> Routine sample collection of Still yard, machine line No <br /> asphalt,flux, sealant, or <br /> adhesive <br /> Note: This is not intended to be a complete list of all situations requiring Hazardous Work <br /> permits; others may be identified as situations occur. <br /> E. The hazardous work policy shall be available for inspection by employees and contractors. <br /> II. GENERAL REQUIREMENTS <br /> A. A hazardous work permit is valid only for the specific work described on the permit. No <br /> other work is to be performed regardless of the proximity or similarity to the approved <br /> hazardous work. Additional permits must be issued for other work requiring a permit. <br /> B. A hazardous work permit is made out to the employee(s) or contractors who will perform <br /> the permit work and shall not be valid for anyone else. Revalidation of each permit <br /> requirement must be made for each change in personnel. Personnel must sign their names <br /> on the permits. The area in proximity to the hazardous work shall be identified and <br /> isolated using red danger tape or other form of clearly labeled barricade to prevent anyone <br /> from entering the hazardous work area. Only persons who are signed in on the Hazardous <br /> Work Permit are allowed to enter the taped off area. Operations Management can also <br /> PntPr the area fnr tPr.hninal arivicPmPnt after they_ have initialPd the eyktina n_erm.it if thev <br /> are not a permit approver. <br /> C. When the work extends into a different shift, the oncoming operating area supervisor and <br /> the work supervisor are required to initial the permit. The initialing of the permit is <br /> required to ensure that oncoming supervisors are aware of the work being performed. In <br /> the event that a hazardous work permit extends beyond shift and the work team changes, a <br />