My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2018 VERIFICATION RPT (DEC)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2018 VERIFICATION RPT (DEC)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:10 PM
Creation date
4/29/2022 2:15:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2018 VERIFICATION RPT (DEC)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brusca File No. 137-002 <br />Page 2 <br />December 14, 2018 <br />Murphy Parkway Property Waste Materials Management Verification Report <br /> <br />20, 2018.1 The LEA (the San Joaquin County Environmental Health Department [SJCEHD]) <br />indicated approval of the Clean Closure Plan in a letter dated July 19, 2018 and the Central Valley <br />Regional Water Quality Control Board (CVRWQCB) indicated approval in a letter dated <br />November 21, 2018.2 3 <br /> <br />A Vicinity Map showing the location of the subject parcel is presented as Plate 1. A Site Map <br />presented as Plate 2 shows the layout of the entire parcel, the former area of capped wastes (WU1) <br />on the far northwesterly portion of the site, and the general layout of a commercial/light-industrial <br />building that is under construction on the property. A detail map showing the WU1 area and the <br />locations of verification soil samples collected beneath the removed wastes is presented as Plate <br />3. Plate 4 is a site map that showing the layout of the building and pavements at the site and the <br />waste reuse areas (beneath portions of the building and concrete pavements). Analytical laboratory <br />data for verification soil samples collected beneath WU1 and for samples collected from waste <br />materials excavated from WU1 are summarized on Tables I through VII; the laboratory reports <br />and chain-of-custody documentation are included in the appendix. <br /> <br /> <br />2.0 SITE DESCRIPTION AND BACKGROUND <br /> <br />2.1 Site Location, Description, and Site Development/Construction <br /> <br />The approximate 48-acre subject property is located about 500 feet easterly of Murphy Parkway and <br />about 1,000 feet northerly of D’Arcy Parkway in a commercial and industrial area of Lathrop, San <br />Joaquin County, California. The property consists of an approximate 48-acre parcel identified as <br />APN 198-120-09. A Vicinity Map showing the location of the property is presented as Plate 1, and <br />a Site Map is presented as Plate 2. <br /> <br />Development of the subject property is underway for an approximate 870,000 square-foot <br />commercial/light-industrial structure intended for use for warehouse/distribution purposes. Site <br />grading and project earthwork construction were completed earlier this year. The concrete floor <br />slab and concrete tilt-up walls for the structure have been constructed, and roof construction is <br />partly completed. Underground utilities at the site have been installed, and a stormwater retention <br />pond was constructed on the far southwesterly portion of the site. Onsite areas exterior to the <br />building will support asphaltic-concrete and concrete pavements; portions of the pavements at the <br />site have been completed, and the remainder of the pavements are planned to be constructed in the <br />very near future. Project completion and building occupancy will occur in 2019. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 AGE; “Clean Closure Plan, 17100 Murphy Parkway, Lathrop, San Joaquin County, California, PNA Parcel B <br />(Portion of Solid Waste Information System [SWIS] number 39-CR-0022), APN 198-120-09”; March 5, 2018. <br />2 SJCEHD; “Clean Closure Plan for Parcel B (APN 198-120-09) SWIS 39-CR-0022, 17100 Murphy Parkway, <br />Lathrop”; July 19, 2018. <br />3 CVRWQCB; “Concurrence and Comments for Clean Closure Plan for 17100 Murphy Parkway, APN 198-120-09, <br />Former Pilkington North America Inc., 500 East Louise Avenue, Lathrop, San Joaquin County”; November 21, 2018.
The URL can be used to link to this page
Your browser does not support the video tag.