Laserfiche WebLink
E <br />B <br />A <br />1 1 2 <br />SUMMARY OF PROPOSED WORK: <br />1. INSTALL NEW 300' DEEP WELL ANODE, WITH 200' SEAL, <br />ADJACENT TO INTERSECTION OF BYRON RD AND VON SOSTEN RD. <br />2. INSTALL (1) NEW 4OV/10A ORNAMENTAL ENCLOSURE (MO42437) <br />ADJACENT TO SAP POLE ID 120627410. ORNAMENTAL ENCLSURE <br />TO BE INSTALLED ADJACENT TO FENCE UNE AND ORIENTED SO <br />FRONT AND BACK PANELS CAN OPEN WITH THE 4' REQUIRED <br />CLEARANCE WITHOUT OBSTRUCTION. <br />3. INSTALL BOLLARDS IN FRONT OF ORNAMENTAL ENCLOSURE. <br />4. INSTALL (2) NEW GROUND RODS PER GS&S 0-11.1. <br />NOTE: <br />A. BOTH L -162A AND L-304 HAVE CASINGS AT THIS LOCATION. PRIOR <br />TO MAKING CATHODE CONNECTIONS IT HAS TO BE FIELD VERIFIED <br />THEY ARE BEING CONNECTED TO THE ACTIVE GAS CARRYING <br />SECTIONS OF L -162A AND L-304. <br />B. A SECTION OF L-304 WAS RETIRED ADJACENT TO THE LOCATION <br />WHERE THE CATHODE LEADS WILL BE CONNECTED. PRIOR TO <br />MAKING THE CATHODE CONNECTIONS IT HAS TO BE FIELD VERIFIED <br />THEY ARE BEING CONNECTED TO THE ACTIVE GAS CARRYING L-304. <br />S. INSTALL (2) NEW CATHODE LEADS FROM (E) 30" L -162A AND <br />(E)12"L-304 TO ORNAMENTAL ENCLOSURE. ENSURE CATHODE <br />LEADS ARE LABELED IN THE ORNAMENTAL ENCLOSURE. <br />6. ANODE WIRES AND CATHODE LEADS TO BE LANDED IN NEW <br />JUNCTION PANEL IN ORNAMENTAL ENCLOSURE. <br />7. CONNECT WATCHDOG SCOUT RMU, INCLUDED LN ORNAMENTAL <br />ENCLOSURE. <br />8. INSTALL NEW UNDERGROUND AC SERVICE FROM SAP POLE ID TO <br />ORNAMENTAL ENCLOSURE. ELECTRIC NOTIFICATION 120627410 <br />WAS CREATED FOR THE NEW AC SERVICE. <br />SEQUENCE OF OPERATIONS: <br />SAME AS ABOVE. <br />1 1Z <br />CONSTRUCTION NOTES: <br />GENERAL REQUIREMENTS: <br />1. UNDERGROUND SERVICE ALERT: <br />CALL 811 (1 -BOD -227-2600) A MINIMUM OF 2 BUSINESS DAYS (NOT INCLUDING INITIAL DAY OF <br />CONTACT) IN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES, INCLUDING ALL <br />NON -UTILITIES BEFORE YOU DIG, GRADE, OR EXCAVATE. <br />2. UTILITY NOTES: <br />A. DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION <br />FROM SEVERALSOURCES, AND SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL <br />PRIOR TO FABRICATION. <br />B. THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF <br />UNDERGROUND UTILITIES, PROPERTY LINES, AND OTHER SUBSTRUCTURES IS NOT GUARANTEED <br />TO BE ACCURATE OR ALL-INCLUSIVE, UNLESS OTHERWISE NOTED. CONSTRUCTION PERSONNEL <br />ARE RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE TYPE AND LOCATION OF <br />UNDERGROUND UTILITIES AND OTHER SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR <br />ENCROACHMENTS. <br />C PROSPECTING IS REQUIRED AHEAD OF WORK. ALL OFFSETS OR ROPING WILL NEED TO BE <br />APPROVED BY THE PG&E PROJECT ENGINEER (PED), AND REDLINED DETAILS SHOWN ON PROFILE <br />AND CONSTRUCTION DETAIL SHEETS OF EACH ADDITIONAL SUBSTRUCTURE. <br />D. ALL EXCAVATIONS WITHIN EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT <br />DIG METHODS (e.g. VACUUM EXCAVATIONS OR SIMILAR). <br />3. ELBOWS AND FIELD BENDS: <br />A. ALL BENDS ARE ELBOWS, EXCEPT WHERE SMOOTH FIELD BENDS ARE SHOWN. FIELD BENDS <br />SHALL BE MADE IN ACCORDANCE WITH A-36, SECTION 40. FIELD BENDS MAY BE USED IN UEU <br />OF ELBOWS WHEN PREAPPROVED BY THE PG&E PROJECT ENGINEER (PED). <br />B. IN ORDER TO AVOID EXCESSIVE STRAIN ON THE PIPELINE, THERE SHALL BE A MINIMUM <br />SEPARATION OF 5 FEET BETWEEN A ROPED SECTION OF PIPELINE AND ANY ELBOWS OR FIELD <br />BENDS. <br />C. ALL ANGLES SHOWN IN THE PLAN AND PROFILE ARE APPROXIMATE AND SHALL BE CUT TO SUIT <br />FIELD CONDITIONS. <br />4. SEPARATION FROM OTHER STRUCTURES: <br />A. CROSSING UNDERGROUND FACILITIES: PG&E PIPELINE MUST BE INSTALLED WITH AT LEAST <br />24 INCHES OF CLEARANCE FROM ANY OTHER SUBSTRUCTURE/UTILITY NOT ASSOCIATED WITH <br />THE PIPELINE UNLESS NOTED ON THE DRAWINGS. <br />B. PARALLELING UNDERGROUND FACILITIES: THIS PIPELINE MUST BE INSTALLED WITH AT LEAST <br />5 FEET OF CLEARANCE FROM ANY OTHER UNDERGROUND STRUCTURE/UTILITY NOT ASSOCIATED <br />WITH THE PIPELINE UNLESS NOTED ON THE DRAWINGS. <br />S. RESTORATION AND CLEAN UP: <br />A. RESTORATION OF PUBLIC STREETS, SIDEWALKS, CURBS, ETC. ABOVE PIPE BEDDING SHALL BE IN <br />ACCORDANCE WITH THE LATEST CITY, COUNTY, OR AGENCY STANDARDS. <br />B. WHERE EVER THERE ARE ROW CROPS, THE TOPSOIL SHALL BE REMOVED TO A DEPTH OF 12" AND <br />STORED ON SITE. UPON COMPLETION OF CONSTRUCTION, THE TOPSOIL SHALL BE RESTORED. <br />TAKE CARE TO PREVENT MIXING OF TOPSOIL AND SUBSOIL <br />6. DESIGN NOTES: <br />A. THIS DRAWING HAS BEEN CREATED BY REVIEW OF THE AS -BUILT DRAWINGS & RECORDS. <br />ACCURACY IS DEPENDENT UPON THE SOURCE DOCUMENT LISTED ON THE REFERENCE <br />DRAWINGS. <br />B. PIPE & FITTING SPECIFICATIONS WITH ASTERISK (') ARE CONSERVATIVE ASSUMED VALUES <br />PER TD -4125P-09 PROCEDURE FOR THE RESOLUTION OF UNKNOWN PIPELINE FEATURES (PRUPF). <br />C. ALL WORK DEPICTED IN THIS DRAWING IS TO BE AS -BUILT UNDER THE PRIMARY ORDER NUMBER. <br />7. WELDING REQUIREMENTS: <br />A. ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL <br />MANUALTD-4160M. REFER TO TD-416OP-20 OR TD-416OP-26 FOR GENERAL WELDING REQUIREMENTS. <br />B.PERFORM ALL IN-SERVICE WELDING PER UTILITY PROCEDURE TD416OP-40. <br />C. ALL CANS OR SPOOLS SHALL BE A MINIMUM LENGTH OF ONE PIPE DIAMETER, WHENEVER POSSIBLE. <br />D. WHEN INTERNAL MISALIGNMENT AT GIRTHWELDS EXCEEDS 0.094", BACKWELD WHERE THERE IS <br />ACCESS TO THE INSIDE OF TH E WELD. WHERE THERE IS NO ACCESS TO THE INSIDE OF THE WELD, <br />MACHINE BORING OR GRINDING IS REQUIRED. BACKWELDING, GRINDING, OR BORING MUST BE <br />DONE IN ACCORDANCE WITH TD-416OP-20 OR TD -4160-26, AS APPROPRIATE. <br />8. STRENGTH TEST REQUIREMENTS <br />A. STRENGTH TESTING SHALL MEET PRESSURE AND DURATION REQUIREMENTS OF GAS STANDARD <br />A-34 AND SHALL BE CONDUCTED IN ACCORDANCE WITH UTILITY PROCEDURE TD -41375. <br />B. ALL WELDS THAT HAVE NOT BEEN STRENGTH TESTED AND ALL FITTINGS SHALL BE SOAP TESTED AT <br />100 PSI AND AT OPERATING PRESSURE BEFORE COATING CAN OCCUR. <br />9. COATING REQUIREMENTS: <br />A. ALL EXPOSED PIPE AND FITTINGS ARE TO BE COATED IN ACCORDANCE WITH GAS STANDARD <br />E-30. ALL COATING ON BURIED PIPE AND FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH <br />GAS STANDARD E-35. <br />B. FOR COATING SELECTIONS ON BURIED PIPE, SEE DIRECT BURIAL COATING SELECTIONS TABLE. <br />C. CONTACT THE PROJECT ENGINEER (PED) TO REQUEST VARIANCE FROM THE <br />APPROVED COATING PRODUCTS. <br />10. INSPECTION OF EXISTING PIPEUNE: <br />A. WHENEVER EXISTING BURIED GAS FACILITIES ARE EXCAVATED DURING ENGINEERING OR DURING <br />CONSTRUCTION, FOLLOW TD-510OP-01 TO DOCUMENT PIPE INSPECTION. THIS APPLIES TO EXISTING <br />AND TO BE RETIRED FACIUTIES. <br />B. EXISTING GIRTH WELDS, AT TIE-IN LOCATIONS, SHALL BE IDENTIFIED AND REMOVED IF PRACTICAL. <br />C. PRIOR TO TIE-IN, INSPECT COATING AND PIPE FOR DEFECTS. IF DEFECTS ARE FOUND, <br />CONTACT PROJECT ENGINEER (PED) FOR GUIDANCE. <br />sl 3 <br />CUMENT CO TMNS <br />I 9 I 10 <br />BILLOFWn SNEET7 <br />10BID C-1766 <br />CTH ONFID PROPRIETARY <br />CONFIDENTIAL, PROPRIETARY <br />INFORMATION THAT 15 THE $OI F <br />O <br />PROPERTY OF PACIFIC GAS AND <br />ESTIMATOR /DESIGNER -- DEREKWHITTEMORE (925)586-0 <br />55UE0 FOR CONSTRUCDON 7/038101 MW 51(YN <br />ELECTRIC COMPANY AND IS <br />INEENDED FOR USE ONLY BY <br />11. TIE-IN AND CLEARANCE PROCEDURE TO BE PREPARED AND PERFORMED IN ACCORDANCE WITH <br />LAND PLANNER - TBD TBD <br />AUT101111D PACIFIC GAS AND <br />ELECTRIC COMPANY EMPIDYEES <br />K..W tars bsloW. <br />A. TD-410OP-01, HOT AND COLD WORK METHODS FOR NATURAL GAS TRANSMISSION PIPELINE <br />AND ITS AGENTS. <br />® PG&ECO <br />Call before you Big. <br />LOCAL CORROSION -- LOUIE FANTIN (510) 910 -TD <br />4 5 #1 <br />6 I 7 I °i8 <br />I 9 I 10 <br />BILLOFWn SNEET7 <br />10BID C-1766 <br />CONTACT INFORMATION: <br />PROJECT MANAGER - ARTUROAHUMADA (925)404 <br />ISSUED FOR CONSTRlKTKK1 7M 01 DEWS MW S%YN <br />ESTIMATOR /DESIGNER -- DEREKWHITTEMORE (925)586-0 <br />55UE0 FOR CONSTRUCDON 7/038101 MW 51(YN <br />FIELD ENGINEER / CM - TBD TBD <br />11. TIE-IN AND CLEARANCE PROCEDURE TO BE PREPARED AND PERFORMED IN ACCORDANCE WITH <br />LAND PLANNER - TBD TBD <br />THE FOLLOWING WORK PROCEDURES: <br />CORROSION ENGINEER - SEAN YOST (925)324-6 <br />A. TD-410OP-01, HOT AND COLD WORK METHODS FOR NATURAL GAS TRANSMISSION PIPELINE <br />LOCAL MAINTENANCE --- DAVE DURHAM (925) 383-6 <br />SUPERVISOR <br />SHUTDOWN AND TIE-IN. <br />LOCAL CORROSION -- LOUIE FANTIN (510) 910 -TD <br />B. TD -"41S, GAS CLEARANCE PROCEDURES FOR FACILITIES OPERATING OVER 60 PSIG. <br />-"41S, <br />MECHANIC <br />12. COATING REMOVAL: <br />A. PERFORM THE FOLLOWING STEPS, IN ACCORDANCE WITH TD -4711P-01, BEFORE REMOVING <br />ASPHALTIC PIPE WRAP ON PIPELINES INSTALLED PRIOR TO 1972 (BASED ON PG&E ANALYSIS, <br />PIPE INSTALLED IN 1972 OR LATER DOES NOT HAVE PIPE WRAP THAT CONTAINS ASBESTOS): <br />1. WHEN A PIPE WRAP SAMPLE IS REQUIRED TO BE ANALYZED FOR ASBESTOS: <br />a. COLLECT SAMPLE PER TD -4711P-01 AND COMPLETE CHAIN OF CUSTODY FORM <br />TD4711P-01-FOl. <br />D. FILE PINK COPY OF THE CHAIN OF CUSTODY FORM AND FINAL LABORATORY RESULTS <br />WITH THE AS-BUILTS. <br />/� <br />REFERENCE DRAWINGS: <br />2. WHEN REMOVING PIPE WRAP THAT CONTAINS ASBESTOS, OR FOR EMERGENCY WORK, <br />FOLLOW TD -4711P-01 "PIPE WRAP REMOVAL, HANDLING AND DISPOSAL". <br />OPERATING MAPS - 384507, SH 1(REV 86) <br />CATHODIC PROTECTION NOTES: <br />OPERATING DIAGRAMS - N/A <br />1. FOLLOW TD-510OP-01 TO DOCUMENT INTERNAL CORROSION AND EXTERNAL CORROSION <br />AS-BUILTS - N/A <br />INSPECTION OF THE PIPELINE. <br />2. INSTALL ELECTROLYSIS TEST STATIONS IN ACCORDANCE WITH GAS DESIGN STANDARDS <br />0-10, 0-10.1 AND 0-10.2. <br />3. UPON COMPLETION OF BORINGS, CONTACTTHE CORROSION SUPERVISOR FOR THE LOCAL <br />AREA/DIVISION TO PERFORM CURRENT DRAIN TESTS ON THE PIPELINE SEGMENTTHAT <br />WAS INSTALLED IN THE BORE. THE CURRENT DRAIN TEST MUST BE PERFORMED PRIOR TO <br />WELDING PIPE ON EITHER SIDE OF THE BORE. <br />4. FOR THE INSTALLATION OFTHE WATCHDOG RECTIFIER REMOTE MONITOR, CONTACT THE <br />CORROSION SUPERVISOR FOR THE LOCAL AREA/DIVISION. <br />S. BONDING CABLES TO BE INSTALLED ACROSS PIPELINE CUT-OUTS AT ALL LOCATIONS THE <br />PIPELINE IS SEVERED PRIOR TO REMOVAL CHAIN CLAMPS, MAGNETIC CLAMPS, OR OTHER <br />CONSTRUCTION MANAGEMENT APPROVED CLAMPS AND N6 (MIN) STRANDED CABLE SHALL <br />BE UTILIZED. CLAMPS TO REMAIN IN PLACE UNTIL PIPELINE IS TIED IN. <br />RETIREMENT PROCEDURE FOR EXISTING PIPE: <br />1. GT&D UTILITY WORK PROCEDURE TO 9500P-16, "DEACTIVATION AND/OR RETIREMENT OF <br />UNDERGROUND GAS FACILITIES," SHALL BE FOLLOWED. <br />2. THE EXISTING PIPE SECTIONS SHALL HAVE FREE LIQUIDS REMOVED AND BE 100% PURGED <br />PER GAS DESIGN STANDARD A-38, "PROCEDURES FOR PURGING GAS FACILITIES." <br />3. THE PIPE SHALL BE SECTIONALRED AT INTERVALS AS SPECIFIED IN THE RETIREMENT PLAN. <br />THE LOCATIONS CALLED OUT ARE APPROXIMATE AND ARE SUBJECT TO FIELD VERIFICATION TO <br />IDENTIFY THE MOST OPTIMUM LOCATION IN THAT VICINITY. ACCURATE SURVEY DATA MAY <br />NOT BE AVAILABLE FOR THESE LOCATIONS SO USE CAUTION DURING EXCAVATION AND WHEN <br />IDENTIFYING THE PIPELINE TO BE RETIRED. OTHER ACTIVE PIPELINES MAY BE IN THE AREA. <br />4. AT EACH SUCH LOCATION NOTED ABOVE, A PIECE OF PIPE AT LEAST 24" LONG SHALL BE <br />REMOVED. INSTALL A 1" HIGH PRESSURE SAVE -A -VALVE (H-17491, M022287) TO CHECK FOR <br />PRODUCT AND PRESSURE PRIOR TO CUTTING INTO THE PIPELINE. THE OPEN ENDS OF THE <br />RETIRED PIPE SHALL BE SEALED BY THE MOST APPROPRIATE METHOD OUTLINED IN GT&D <br />UTILITY WORK PROCEDURETD-9500P-16. BACKFILL MUST BE THOROUGHLY COMPARED IN <br />PLACE OF THE REMOVED SECTION OF PIPE. <br />DESIGN CHANGE PROCEDURE <br />MAINTENANCE AND CONSTRUCTION PERSONNEL MUST OBTAIN APPROVAL FROM THE PROJECT <br />ENGINEER (PED) BEFORE MAKING ANY DESIGN CHANGE TO GAS FACILITIES PER TD -4014P-06. <br />E <br />0 <br />B <br />A# <br />PIPELINE - CONSTRUCTION NOTES <br />L-304 MP 3.0 <br />INSTALL 200' DEEP WELL ANODE & RECTIFIER <br />TRACY, SAN JOAQUIN COUNTY <br />6ASTRAxSMtSB10N8 DISTRte000N <br />PACIFIC GAS AND ELECTRIC COMPANY <br />SAN FRANCISCO, CAUFORNIA <br />BILLOFWn SNEET7 <br />10BID C-1766 <br />¢MrcowRcoxsrxunloN 78015102 MOG nm <br />ISSUED FOR CONSTRlKTKK1 7M 01 DEWS MW S%YN <br />WEETNO. 2 OF 7 SNEFIS <br />74038102 2 <br />55UE0 FOR CONSTRUCDON 7/038101 MW 51(YN <br />REswmoNA. <br />REVISIONS <br />6 7 $I8 m53D SBRRDNa, ` 9 1 10 R wa <br />E <br />0 <br />B <br />A# <br />