Laserfiche WebLink
SANAHO N <br />—COUNTY <br />Environmental Health Department <br />5. This facility shall have a sink with at least three compartments with two integral metal <br />>f' drain boards, and must have an indirect connection for waste discharge. The sink <br />0 compartments and drainage facilities shall be large enough to accommodate immersion <br />of the largest equipment and utensils [CRFC §114099]. <br />6. The handwashing and food preparation sinks shall be separated from the <br />�V, warewashing sink or food preparation / storage areas by a metal splash guard, if <br />separation is less than twenty-four (24) inches. Splash guard shall be at least six (6) <br />inches in height from back edge to front edge [CRFC §113953]. <br />,I,z-7. Provide well fitting, self-closing doors to all toilet rooms [CRFC §114276]. <br />8. Provide enclosed light fixtures, or shatterproof shields for light fixtures, over all areas <br />where food is prepared, utensils cleaned, or open food is stored [CRFC §114252.1]. <br />9. Hot water shall be supplied at a minimum temperature of at least 120°F measured from <br />the faucet. The water heater shall have a minimum rating of 40,000 BTU if gas and <br />r—� 9KW is electric. [CnR_F.C. §114192]. <br />The EHD must be kept informed of the construction progress. A final inspection must be <br />performed, operating permit fees paid, and approval to operate granted prior to opening for <br />business. All equipment must be installed and thorough cleaning completed prior to the final <br />inspection. Inspections must be scheduled at least 48 hours in advance. Charges for <br />additional inspections, re -inspections and/or consultations may be assessed at the EHD <br />hourly rate of $ 152 per hour. <br />Any item(s) inadvertently overlooked in the plan check process, which is not in compliance <br />with applicable State laws, and/or city or county ordinance codes, shall be constructed or <br />reconstructed upon request of the EHD. Inferior workmanship, equipment, or materials will not <br />be accepted for the construction or operation of a food facility. Any variance from the <br />requirements outlined in this letter will require written approval from the EHD. Approval of the <br />submitted plans shall become null and void if the work authorized is not commenced within <br />180 days from the date of approval, or the work authorized by such plans is abandoned. In <br />order to renew action on an expired plan approval, the applicant shall submit fees equal to <br />that of a new plan review. A copy of the approved plans shall be available on site at the time <br />of final inspection. <br />If you have any questions, please contact Gigi Fahmy, Senior Registered Environmental <br />Health Specialist, at (209) 616-3052. <br />Sincerely, <br />Jeff Carruesco, REHS, RDI <br />Program Coordinator <br />2 of <br />