Laserfiche WebLink
°P4��N COUNTY OF SAN JOAQUIN THOMAS R. FLINN <br /> 2' '•.Z <br /> Q. •-� DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> H: P. O. BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> = STOCKTON,CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> 209/468-3000 STEVEN WINKLER <br /> CqC' <br /> F6 Ra`P FAX:209/468-2999 <br /> DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> �EC E14' <br /> April 8, 1999 r � <br /> APR 0 91999 <br /> MEMORANDUM Community Development ucPL. <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Jeff Fisher <br /> FROM: Gabriel Karam, Senior Civil Engineer G k <br /> Public Services Division <br /> SUBJECT: SA-99-25 A SITE APPROVAL APPLICATION TO PERMIT AN ADDITION OF A <br /> 6,000 SQUARE-FOOT METAL WAREHOUSE BUILDING TO AN EXISTING <br /> MANUFACTURING FACILITY, LOCATED ON THE NORTHEAST CORNER OF <br /> VALLEJO COURT AND ROTH ROAD. (DISTRICT 1). <br /> APPLICANT: Parex Inc. APN: 193-380-04 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. <br /> Roth Road has an existing right-of-way width of 60 feet and a planned right-of-way width of 84 feet. <br /> Vallejo Court has an existing right-of-way width of 60 feet and a planned right-of-way width of 60 feet. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $616 per 1,000 gross <br /> square foot of building as manufacturing in the Stockton area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 2. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The <br /> fee is due and payable prior to issuance of the building permit. The fee currently is $159 per <br /> 1,000 gross square foot of building as manufacturing. The fee shall be automatically increased <br /> on January 1 of each year through the year 2005 at the rate of 7.66 percent. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division ((209) 468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for Development <br /> Projects. <br /> GK:RH:ti <br /> PS-9D076.11 D <br /> E: Manuel Lopez, Deputy Director/Development <br />