Laserfiche WebLink
e. No heavy equipment will travel over the S.S.J.I.D. pipeline without approved bridging, said <br /> bridging to be approved between S.S.J.I.D. and the contractor <br /> f. No trees and/or rubbish will be disposed of or stored on the S.S.J.I.D. will be notified 48 <br /> hours in advance of any excavation work. <br /> g. S.S.J.I.D. will be notified 48 hours in advance of any excavation work. <br /> h. The landowner agrees that the existing pipeline or concrete lined canal do not presently <br /> leak and agrees that any damage will be repaired at landowner's expense. <br /> i. It is understood by the applicant that the District shall not be held responsible to remedy <br /> high water table problems created by the excavation. <br /> j. Landowner shall provide District with sufficient fill dirt from excavation for protection of <br /> canal or pipeline and place fill dirt as directed by District Engineering Department. <br /> k. Any irrigation service structure(District or Private) modification or installation necessitated <br /> by the proposed excavation shall be performed at the landowner's expense. <br /> Furthermore, owner shall obtain a Structure Permit from the District prior to installing, <br /> modifying, or removing any irrigation structures on District facilities. <br /> Conditions of Approval - 3 - GX-94-1 <br />