Laserfiche WebLink
F_ <br /> ■ <br /> © \ I EROSION CONTROL GENERAL NOTES S I E G F R I E D <br /> \ ' \ <br /> I � <br /> 1. PLANS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO SHOW ALL OFFSETS. THE SITE IS DYNAMIC AND CHANGES ON A DAILY BASIS, 3428 Brookside Road <br /> CHANGES SHOULD BE MADE ACCORDING TO EXISTING CONDITIONS. BECAUSE IT IS IMPOSSIBLE TO PREDICT ALL POSSIBLE SITUATIONS, Stockton,California 95219 <br /> L 3131 31310 \ I I CONTRACTOR SHALL USE BEST MANAGEMENT PRACTICES TO ENSURE QUALITY CONTROL. 209-943-2021 <br /> Fax: 209-942-0214 <br /> 2. THE CONTRACTOR SHALL REVIEW THE CURRENT STORM WATER POLLUTION PREVENTION PLAN SWPPP IT IS THE CONTRACTORS SOLE <br /> www•siegfriedeng.com <br /> 0 0 \ ® i I RESPONSIBILITY FOR CONDUCTING HIS/HER OPERTATIONS IN ADHERANCE TO THE SWPPP.THE CONTRACTOR IS RESPONSIBLE FOR ANY <br /> W - FINES, DELAYS,AND/OR DAMAGES RESULTING FROM ANY STATE WATER QUALITY CONTROL BOARD SANCTIONS CAUSED BY THE <br /> OPERATION OF THE CONTRACTOR OF HIS/HER SUBCONTRACTORS. <br /> 0 LU <br /> ►- I III <br /> l I \ C 3. THE FOLLOWING PLANS ARE ACCURATE FOR EROSION CONTROL PURPOSES ONLY.THE CONTRACTOR SHALL FOLLOW THESE PLANS <br /> \ / UNLESS FIELD CONDITIONS DICTATE MODIFICATION. IF MODIFICATION IS NECESSARY,A SWPPP AMENDMENT MUST BE DONE.THIS MAY S/0 <br /> II I REQUIRE MODIFICATION TO THESE DRAWINGS AND ENGINEER CONCURRENCE. )FES <br /> ���e .S S l <br /> El F <br /> I <br /> \ I 4. INSPECT AND REPAIR FILTERS AFTER EACH STORM EVENT. REMOVE SEDIMENT WHEN 1/2 OF THE FILTER DEPTH HAS BEEN FILLED. <br /> =19.5 -� Ij - REMOVED SEDIMENT SHALL BE DEPOSITED IN AN AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER FILTERING MEASURE. SEDIMENT w / �' H <br /> FF1 II _ 19.0 1a 5 0- I 1 <br /> AND SHALL BE IMMEDIATELY REMOVED FROM PAVEMENT OF ROAD. ✓I, <br /> i --. ---ice�� s, o I p: 093 X23 <br /> o 01st p cry o o cry Q) 4,3 � o <br /> `n 0. � ^' ^ � LO c6 ' ; 1 -17.5\�5 ti X00 ��0o rn 78.5 q�F CN IL <br /> I / 5. UNFINISHED AND DISTURBED ARE TO BE PROTECTED WITH AN APPLICATION OF BLOWN STRAW AND ORGANIC BINDER. <br /> � \ / \ I ITEM LB/ACRE OFC <br /> STRAW 4,000 <br /> ORGANIC BINDER 200 DATE SIGNED: 01/28/22 <br /> Lq U� o � o 4-) o h U� o U� o U� �� 7 6h �p ✓ 6. ALTERNATE INLET PROTECTION SHALL BE USED ON ROADS OPEN TO THE PUBLIC IF ANY HAZARDOUS MATERIALS OR WASTES WHICH <br /> ` ter Uri LO (0 (0 ,^ (0 U') �� \ i�� O 6S � ' c� 06 <br /> HAVE BEEN TREATED,STORED, DISPOSED,SPILLED, OR LEAKED IN SIGNIFICANT QUANTITIES ONTO THE CONSTRUCTION SITE,THE <br /> I I I I I � J \ � ��\ � \ J� \ I I ( \ I � j CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE THEM FROM THE SITE AND DISPOSE OF PROPERLY. <br /> I / ❑�❑1 ' <br /> ' \ �/ � ` \ � \' ❑ \ I // ° 1 I 7. CHLORINATED OR DECHLORINATED WATER SHALL NOT BE DISCHARGED INTO THE STORM DRAIN SYSTEM.THE CONTRACTOR MAY <br /> DISPOSE THIS WATER INTO THE SANITARY SEWER SYSTEM UPON APPROVAL BY THE GOVERNING AGENCY. <br /> o s o o o o o. 0 h 6, 7� 7] > o s o 0 0 <br /> 1.175 �h r�4j cd ss�6 5 C �• �' <br /> 8. THE CONTRACTOR SHALL KEEP MAINTENANCE, INSPECTION,AND REPAIR PROCEDURES TO ENSURE THAT ALL GRADED SURFACES, <br /> WALLS, BERMS, DRAINAGE STRUCTURES, VEGETATION, EROSION AND SEDIMENT CONTROL MEASURES,AND OTHER CONTROLS ARE <br /> � �. � � � � \ MAINTAINED IN GOOD AND EFFECTIVE CONDITION AND ARE PROMPTLY REPAIRED OR RESTORED WHEN NECESSARY.ANY DEWATERING <br /> WATER SHALL NOT BE DISCHARGED DIRECTLY INTO THE STORM WATER SYSTEM, AND SHALL NOT BE DISCHARGED INTO THE SEWER <br /> SYSTEM. <br /> - 7 7 760- 16.0- � h4' kc;���� ,�iS to � � 4*) <br /> o 7 0 >s o �s o 5 <br /> . 1. co co' 6 6' r� CO � C1 o -19, <br /> 9. ALL DEWATERING WATER MUST BE CHANNELED THROUGH AN APPROVED SEDIMENT BARRIER PRIOR TO THE WATER ENTERING THE <br /> \ ' <br /> 0-14 STORM SYSTEM. <br /> I I 10. PAVEMENT CLEANING-FLUSHING OF STREETS/PARKING LOTS TO REMOVE DIRT AND CONSTRUCTION DEBRIS IS PROHIBITED UNLESS <br /> BUILDING I \ PROPER SEDIMENT CONTROLS ARE USED. PREFERABLY,AREAS REQUIRING CLEANING SHOULD BE SWEPT. <br /> ui ui L6 7SS 16.0 X60 \ cc; rn rn' rn <br /> 11. ALL STOCKPILES OF MATERIALS THAT ARE NOT GOING TO BE USED FOR 14 DAYS SHALL BE COVERED. <br /> `j \ I 12. CONTRACTOR TO USE BEST MANAGEMENT PRACTICES BMPs THROUGHOUT CONSTRUCTION. USE ALL BMPs THAT APPLY TO THE <br /> \ I PROJECT, INCLUDING BUT NOT LIMITED TO THE FOLLOWING BMPs: <br /> (I C6 o o' 7& a; O A. DRAIN INLET PROTECTION-CALIFORNIA STORMWATER BMP HANDBOOK SECTION SE-10 <br /> ` B. SOLID WASTE MANAGEMENT-CALIFORNIA STORMWATER BMP HANDBOOK SECTION WM-5 <br /> C. MATERIAL STORAGE-CALIFORNIA STORMWATER BMP HANDBOOK SECTION WM-1 <br /> D. PAVING-CALIFORNIA STORMWATER BMP HANDBOOK SECTION NS-3 <br /> E. DUST CONTROL, SEDIMENT CONTROL, EROSION CONTROL AND CONCRETE WASHOUT AREAS-SHOWN ON THIS SHEET <br /> BUILDING H I WITH DETAILS <br /> 0 0 o u-vo 7� 7S �6, o 0 o O 5/ o O� I Ln o <br /> IX5 un, `��' •p 0, o co c!o co �O �6 \Cb 0 Cd rn ai ti N s I <br /> 13. CONTRACTOR SHALL INSTALL DRAIN INLET PROTECTION FOR ALL CATCH BASINS LOCATED IN THE VICINITY OF WORK.THIS INCLUDES <br /> J .J / > I I \ J ' / I ANY CATCH BASINS LOCATED IN THE PUBLIC RIGHT-OF-WAY,AS WELL AS ANY ON-SITE CATCH BASINS LOCATED IN THE PARKING LOT. <br /> - I I 14. CONTRACTOR SHALL ENSURE THAT CONSTRUCTION ACTIVITIES DO NOT DEPOSIT SEDIMENT ONTO THE PARKING LOT OR PUBLIC <br /> ROADWAY, SIDEWALK,AND GUTTERS. <br /> 0 0 0 0 0 0 0 �7 O h.n. , � r, <br /> _ PHELAN <br /> Sp�Nb. I ASO L`_'�•�� +�6 ,�0 sp 4�ro 16.0-16J�F 16.0 16 r,`o 16• o _ �� rn - QOM oo <br /> \ / / 15. CONTRACTOR SHALL USE STREET SWEEPING OR OTHER DRY-SWEEPING METHOD,AS NECESSARY,TO REMOVE D EVELOPM ENT <br /> CONSTRICTION-RELATED SEDIMENTS FROM PAVEMENT IN PROJECT AREA PARKING LOT AND PUBLIC SIDEWALKS, GUTTERS,AND 450 Newport Center Drive, Suite 230 <br /> \ 3 r I \ 3 3 / + I i ROADWAY. Newport Beach, CA 92660 <br /> 1 <br /> Ia� V_j L I 16. CONTRACTOR SHALL SCHEDULE WORK FOR DRY-WEATHER DAYS WHEN NO RAIN IS IN THE IMMEDIATE FORECAST. <br /> do -1l �19 �, e e e 20.0 20.E o' <br /> \I \01-� -H Q QO QO _ ESDMH I <br /> 77 1 - - - - - - RIM 19.1 <br /> I INV 8.6 40"N / <br /> • • 4 4 a � , � BUILDINGS H&I <br /> n 4 - - - - - - - --77- - - - - - - - - - - - - - - - = -0- - - Ria �\�- - --❑�- - - - - - - �___ Q - - - - - - - - - - - - - - - - - -Q---- - - - - - - - <br /> t� - - - - <br /> - - - - - - - - - - - - - - - - - - - - - - - - <br /> � �- � - „ , T - - - - - - - - ,,w,� " HOLLY COMMERCE CENTER <br /> _J4/1 4=- <br /> }� EROSION CONTROL LEGEND <br /> - �1 - - - - -_- ,16.5 / <br /> 13,16 <br /> 17.5 __ <br /> 16 �a <br /> -- -19.0I - -,r9- - - -� - - - - - - /ice+ <br /> � 18.5 •- �__ , � � �� INV,3.1924 NE <br /> __ ---------18.5 w 1g. ,�g512.w ESDCB w ,�o,• 20p 2p5 z L� 21.0 KEY NOTE SYMBOL DESCRIPTION <br /> RIM 18.60 <br /> fi INV 18.4712'E <br /> - - - ARBOR AVENUE - <br /> 190, - - _ �9 _ - - �9s , 200 �_2ps� T - - -21.0-21.0- N�0,88;2 9375 SUGAR RD <br /> TRACY, CA 95304 <br /> - - 17 5 18 5 1f =18.0 =18.0- =18.5 4, 20.0 / <br /> =17.0= -- -17.5- .�1 17.5_ E L� �0_. 18.0- - _ --TEL_ - TELE_ _ T "'�" <br /> RIM 20,82 E O FIBER ROLLED WATTLE, SEE DETAIL 1 <br /> L� F=l!! _ TELE 1 ELS E _ �s�s? LE L� - TFC F <br /> im <br /> RM 7.82 ® ES[ iLL4 'I)-C <br /> �r• <br /> INV,0.32,2•N 17,60 <br /> NIV�,Q4012'N ' - -- `-- - - - + + ❑0 GRAVEL BAG FILTER AT DROP INLET, <br /> SEE DETAIL 2 <br /> MILESTONES: <br /> EROSION CONTROL PLAN <br /> STABILIZED CONSTRUCTION ENTRANCE, 28 JANUARY 2022 <br /> 1" = 50' 0' 25' 50' 100' BUILDING DEPARTMENT SUBMITTAL <br /> 3 CONTRACTOR TO DETERMINE SIZE&LOCATION, <br /> SEE DETAIL 3 <br /> SCALE: V=50' <br /> O CONCRETE WASHOUT, CONTRACTOR TO <br /> Fill DETERMINE LOCATION,SEE DETAIL 4 <br /> REVISIONS: <br /> FIBER ROLL CRUSHED AGGREGATE GREATER <br /> SLOPE% ROLL SPACING 8" MIN. THAN 3"BUT SMALLER THAN 6" <br /> 0-25 50 FT (MIN.) GRATE EXISTING DRAINAGE 10'MIN <br /> 12"LAP MIN. CORRUGATED STEEL PANELS STAPLES <br /> J SOF (2 PER BALE) 10 ML <br /> 0 25-50 15 FT E EXISTING RUNOFF WATER DITCH TO CARRY RUNOFF TO A ® ® ® ® ® ® ® BINDING <br /> ARIES ORIGINAL PLASTIC LINING <br /> 0 50%OF 10 FT -� C <br /> GREATER AC PAVING WITH SEDIMENT SEDIMENT TRAPPING DEVICE WIRE <br /> 0 2"MIN. GRADE STAKE <br /> Z 4..MAX. IFI I I I I I I I I � � / <br /> (TYP) <br /> 0 _ 0 20'R 12"MIN., UNLESS OTHERWISE FILTER STRAW <br /> No NOTE: 12" 12"LAP - olop ���� MIN. SPECIFIED BY A SOILS FABRIC Lu BALE <br /> W INSTALL FIBER ROLL MIN. (MIN.) QP�`�\ _�' A ENGINEER <br /> WOOD OR <br /> ALONG A LEVEL CONTOUR. 4' + _ ��� SECTION A-AL NATIVE MATERIAL METAL STAKES <br /> MAX. / \� MAXIMUM BAG / P`c� (OPTIONAL) (2 PER BALE) <br /> 4, 3/4"x3/4" DEPTH AT TOP OF FILTER <br /> MAX. WOOD STAKES I 1 DRAIN BAG 20'R MIN. A SECTION B-13 <br /> V MAX.4'SPACING <br /> WASH RACKB STRAW BALE <br /> w EXISTING CROSS PLYWOOD <br /> V) Ilw FIBER ENTRENCHMENT DETAIL DRAINAGE \ 50'OR 4X THE CIRCUM. 10 MIL PLAN (TYP) 48"x48" <br /> 0 ROLLS MAX. GRATE / FILTER PLASTIC <br /> /_ � t f= � FILTERED ��4DRAIN <br /> OF THE LARGEST VEHICLE TIRE, � PAINTED WHITE <br /> I,I ,, WHICHEVER IS GREATER B 12 MIN. CRUSHED AGGREGATE LINING NOTES: <br /> 4' S RUNOFF GREATER THAN 3 BUT 1. ACTUAL LAYOUT BLACK LETTERS <br /> V) MAX. SMALLER THAN 6" 2" DETERMINED IN FIELD. CONCRETE ° 6" HEIGHT <br /> CD III INSTALL A FIBER ROLL 1/8"0 WASHOUT <br /> ZI'I NEAR SLOPE WHERE IT EXISTING <br /> o VERTICAL SPACING FILTER FABRIC ORIGINAL S 2. THE CONCRETE WASHOUT ° 0.5"LAG <br /> TD MEASURED ALONG THE FACE TRANSITIONS INTO A C TEEL WIRE DRAIN NOTE: 4 <br /> CROSS <br /> NOF THE SLOPE VARIES STEEPER SLOPE DRAIN INLET MANY DESIGNS CAN BE FIELD GRADE SIGN SHALL BE INSTALLED 3' SCREWS <br /> z BETWEEN 10'AND 20' WITHIN 30 FT.OF THE FABRICATED,OR FABRICATED STAPLE DETAIL TEMPORARY CONCRETE 3' WOOD POST <br /> UNITS MAY BE USED. 3"0"x8' <br /> r PLAN VIEW SECTION C-C 12"MIN., UNLESS OTHERWISE SPECIFIED WASHOUT FACILITY. <br /> z BY A SOILS ENGINEER <br /> w TYPICAL FIBER ROLL INSTALLATION SECTION B-B <br /> 0 <br /> Q <br /> STABILIZED CONSTRUCTION PROJECT: 17017 <br /> r 1 FIBER ROLLS 2 GRAVEL BAG FILTER AT DROP INLET 3 ENTERANCE/OUTLET IIIIITIRE WASH 4 CONCRETE WASHOUT I F:\17projects\17017HollySugarindustrial\Improvement <br /> 0 <br /> SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS <br /> • pans nsite 7-C - PLAN.dwg <br /> - - <br /> PLAN.dwg <br /> z DATE: 1/28/2022 <br /> DRAWN BY: LSF/MWK <br /> CDM <br /> SHEET TITLE: <br /> 0 <br /> EROSION CONTROL PLAN <br /> o <br /> � O <br /> U <br /> 0 cD Know what's below. <br /> fl- Call before you dig. C6mO <br /> Ll: r) <br /> UNIFORM DRAWING SYSTEM - U.S.NATIONAL CAD STANDARD VERSION 3.1 <br />