My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
CORRESPONDENCE_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:12:51 PM
Creation date
5/20/2022 11:54:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2019
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />The fees are as follows: Work plan is $465 (3hr @$152) 4 wells @ $152 and 24 borings (under 1 permit @ $152). The <br />total is $1216. Please keep in mind any additional time spent on this project will be billed @ the EHD hourly rate of $152. <br />Please let me know if you have any questions. Robert <br /> <br />Robert McClellon, Program Coordinator REHS <br />San Joaquin County Environmental Health Department <br />1868 E. Hazelton Ave <br />Stockton, CA 95205 <br />Ph (209) 468-0332 <br />Fax(209) 468-8392 <br /> <br /> <br /> <br />From: Brian W. Millman [mailto:bmillman@advgeoenv.com] <br />Sent: Friday, February 22, 2019 11:51 AM <br />To: Robert McClellon [EH] <br />Cc: Linda Turkatte [EH]; Kasey Foley [EH]; Martin Wenzel <br />Subject: RE: San Joaquin Cogen Site Assessment Work <br /> <br />Hi Robert, <br /> <br />The GPR survey was already performed on 19 February 2019 using Electromagn etic Induction (EMI); <br />we discussed the scheduled date for the EMI in the meeting. Ann Palmer was onsite for the survey. <br />The EMI does not provide immediate information onsite, they have to send the data to their office and <br />compile it and map it. I am waiting for the results of the survey. I was hoping I would receive it today <br />but it may not be until Monday. Both AGE and the client understand that the EHD and Regional Board <br />have different concerns and that additional work may be necessary using varying methods to meet <br />the satisfactions of both agencies. <br /> <br />Thank you for confirming that the EHD will be onsite for the work scheduled from March 11 through <br />15, 2019. <br /> <br />Will you please confirm the permit fees? <br /> <br />Thanks, <br /> <br /> <br />Brian W. Millman, P.G. <br />Senior Geologist <br />CA Professional Geologist No. 8574 <br />CA QSP/QSD No. 26882 <br />Advanced GeoEnvironmental, Inc. <br />Environmental • Compliance • Industrial Hygiene • Geotechnical <br />Phone: 800-511-9300 <br />Fax: 888-445-8786 <br />bmillman@advgeoenv.com <br />www.advgeoenv.com <br /> <br />“Working in Partnership with People, Business and the Environment”
The URL can be used to link to this page
Your browser does not support the video tag.