Laserfiche WebLink
4 <br />This email/fax message is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, <br />use, disclosure or distribution of this email/fax is prohibited. If you are not the intended recipient, please contact the sender by email/fax and destroy all <br />paper and electronic copies of the original message. <br /> <br />From: Robert McClellon [EH] <RMcClellon@sjcehd.com> <br />Sent: Friday, February 22, 2019 11:35 AM <br />To: Brian W. Millman <bmillman@advgeoenv.com> <br />Cc: Linda Turkatte [EH] <LTurkatte@sjcehd.com>; Kasey Foley [EH] <KFoley@sjcehd.com> <br />Subject: RE: San Joaquin Cogen Site Assessment Work <br /> <br />Brian, the EHD staff will be onsite for most if not all of the borings. The water board and the EHD have differing <br />authorities and concerns. I know that you have the GRP plan and the EHD would also want to be onsite for that. I want <br />you to know that if the GPR and the boring do not show much or anything your client will need to trench the site to our <br />satisfaction. I know trenches are not in the work plan, so we would need to see a new plan or an amended plan that <br />includes trenching. Robert . <br /> <br />From: Brian W. Millman [mailto:bmillman@advgeoenv.com] <br />Sent: Friday, February 22, 2019 9:59 AM <br />To: Robert McClellon [EH] <br />Subject: RE: San Joaquin Cogen Site Assessment Work <br /> <br />Hi Robert, I hope all is well. <br /> <br />I want to make sure I confirm a couple of items with you and get on the calendar for the site <br />assessment in March at Cogen (17200 Murphy Parkway). We discussed the dates the work is <br />scheduled during the meeting at the Regional Board that you were on the phone for. But I hadn’t <br />contacted you directly since then. The work is scheduled for March 11 through 15, 2019. We will <br />require grout inspection at the end of each day. Grouting each day shouldn’t require too much time, <br />each boring will be to 15 feet so grouting will be quick. Will you please put us on the <br />schedule/calendar for those dates? <br />I will submit the permit application and fees to your office on Monday, I will drop them off myself. I will <br />also include the service agreement, work plan/and approval letter, and H&S Plan. Will you please <br />confirm the total price for me for the work plan review and to install 24 borings and 4 monitoring wells. <br />I just want to be crystal clear about the cost so I can request one check. <br /> <br />Thanks Robert! <br /> <br /> <br />Brian W. Millman, P.G. <br />Senior Geologist <br />CA Professional Geologist No. 8574 <br />CA QSP/QSD No. 26882 <br />Advanced GeoEnvironmental, Inc. <br />Environmental • Compliance • Industrial Hygiene • Geotechnical <br />Phone: 800-511-9300 <br />Fax: 888-445-8786 <br />bmillman@advgeoenv.com <br />www.advgeoenv.com