My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 2 <br /> <br /> Kier & Wright Civil Engineers & Surveyors, Inc. has prepared this Storm Water Pollution <br />Prevention Plan (SWPPP) to comply with California’s General Permit for Storm Water Discharges <br />Associates with Construction and Land Disturbance Activities (General Permit). A copy of the <br />State Water Resources Control Board (SWRCB) Order No. 2009-0009-DWQ has been included in <br />this SWPPP as Appendix A-1. <br />The discharger shall ensure that the SWPPPs for all traditional project sites are developed and <br />amended or revised by a QSD. The SWPPP shall be designed to address the following objectives: <br />1. All pollutants and their sources, including sources of sediment associated with construction, <br />construction site erosion and all other activities associated with construction activities are <br />controlled; <br />2. Where no otherwise required to be under a Regional Water Quality Control Board <br />(RWQCB) permit, all non-stormwater discharges are identified and either eliminated, <br />controlled or treated; <br />3. Site BMPs are effective and result in the reduction or elimination of pollutants in stormwater <br />discharges and authorized non-stormwater discharges from construction activity to the Best <br />Available Technology/Best Control Technology (BAT/BCT) standard; <br />4. Calculations and design details as well as BMP controls for site run-on are complete and <br />correct, and <br />5. Stabilization BMPs installed to reduce or eliminate pollutants after construction are <br />completed.” <br />6. Identify and provide methods to implement BMP inspection, visual monitoring, and <br />Construction Site Monitoring Program (CSMP) requirements to comply with the General <br />Permit. <br /> <br />SECTION 1.2 - PERMIT REGISTRATION DOCUMENTS <br /> <br />To obtain coverage under the Construction General Permit, project related Permit Registration <br />Documents (PRDs) are to be submitted to the SWRCB via the Stormwater Multi Application and <br />Report Tracking System (SMARTS). Kier & Wright will upload this information and file the NOI, <br />with final certification by the Legally Responsible Person (LRP, see Contact list on page i). The <br />applicable Permit Registration Documents that were submitted are as follows: <br /> <br />1. Notice of Intent (NOI) <br />2. Risk Assessment (Construction Site Sediment and Receiving Water Risk Determination) <br />3. Site Map <br />4. Annual Fee (via mail) <br />5. Signed Certification Statement (via mail) <br />6. Post-construction water balance calculation <br />7. Active Treatment System (ATS) plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.