My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 5 <br /> <br />SECTION 1.5 - RETENTION OF RECORDS <br /> <br />The General Permit (Sections I.J.69 and IV.G) requires that all dischargers maintain a paper or <br />electronic copy of all required records for three years from the date generated or date submitted, <br />whichever is last. These records must be available at the construction site until construction is <br />completed. The discharger shall furnish the RWQCB, SWRCB, or the US Environmental <br />Protection Agency (EPA), within a reasonable time, any requested information to determine <br />compliance with this General Permit. <br />SECTION 1.6 - REQUIRED NON-COMPLIANCE REPORTING <br /> <br />If a discharge occurs, the contractor shall file a written report to the Regional Water Quality Control <br />Board (RWQCB) through its online SMARTS website no later than 10 days after the conclusion of <br />the storm event. It is the responsibility of the permittee to properly document reportable discharges <br />or other violations of the General Permit. Exceedances and violations should be reporting using the <br />online SMARTS system and include the following: <br />The report to the Owner and to the RWQCB will contain the following items: <br />1) NAL Exceedance Report <br />o The analytical method(s) method reporting unit(s), and method detection limit(s) of <br />each analytical parameter (analytical results that are less than the method detection <br />limit shall be reported as “less than the method detection limit.” <br />o The date, place, time of sampling, visual observation (inspections), and/or <br />measurements, including precipitation <br />o A description of the current BMPs including planned BMPs not implemented <br />associated with the effluent sample that exceeded the NAL <br />o The date of deployment and type of control measures (BMPs) deployed after the <br />discharge event, or after receiving the notice or order, including additional measures <br />installed or planned to reduce or prevent re-occurrence; and <br />o An implementation and maintenance schedule for any affected BMPs <br />o Self-reporting of any other discharge violations or to comply with RWQCB <br />enforcement actions; and <br />2) Discharges which contain a hazardous substance in excess of reportable quantities <br />established in 40 CFR §§ 117.3 and 302.4, unless a separate NPDES permit has been issued <br />to regulate those discharges. <br /> <br />The records of all reportable NAL exceedances and other non-compliance events shall be kept and <br />logged in Appendix D until the completion of construction. <br />SECTION 1.7 - ANNUAL REPORTING <br /> <br />The General Permit requires that all permittees prepare, certify, and electronically submit an Annual <br />Report through SMARTS no later than September 1 of each year. The contractor shall prepare the <br />annual report as required for the project and submit the document as a Data Submitter (DS) on
The URL can be used to link to this page
Your browser does not support the video tag.