My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 9 <br /> <br />Table 2 - Project Combined Risk <br /> Sediment Risk <br />Low Medium High <br />Receiving <br />Water Risk <br />Low 1 2 2 <br />High 2 2 3 <br /> <br />PROJECT COMBINED RISK IS LEVEL 1. <br />SECTION 2.4 - CONSTRUCTION SCHEDULE <br /> <br />Construction at this site is projected to start February 6, 2019 and continue until May 22, 2019, for a <br />total of three and one-half (3-1/2) months. Please note, this SWPPP has been prepared based on <br />these estimated construction dates. If the construction schedule is projected to be outside of these <br />dates, notify the SWPPP preparer immediately to determine the applicability of the SWPPP <br />requirements and amend the SWPPP and/or PRDs as necessary. The Qualified SWPPP <br />Practitioner shall obtain a copy of the detailed construction schedule including BMP deployment <br />dates and include it in Appendix F. <br />SECTION 2.5 - POTENTIAL CONSTRUCTION SITE POLLUTANT SOURCES <br /> <br />Table 3 – Potential Construction Site Pollutant Sources <br />Construction Activity or <br />Potential Pollutant Source <br />Pollutants Dust Sediment Nutrients Trace Metals Pesticides Oil, Grease, Fuels Other Toxic Chemicals Misc. Waste Vehicles and Equipment Use <br />Vehicles and equipment entering and leaving the project <br />site X X X X X X <br />Vehicles and equipment movement and use within the <br />project site X X X X X X <br />Temporary parking lots and staging areas X X X X X <br />Exposed Areas X <br />Areas of exposed soil that have been cleared and <br />grubbed X X X X X <br />Areas of exposed soil that have been excavated, filled, <br />compacted, or graded X X X X X <br />Construction staging areas X X X X X <br />Vehicle and equipment storage and service areas X X X X X X <br />Material processing areas and transfer points X X X X X X <br />Construction roads X X X X X <br />Spilled Materials X X X X X X <br />Construction stockpiles X X X X X <br />Construction Activities <br />Land clearing and grubbing X X X X X X X X <br />Earthwork including soil excavation, filling, soil <br />compaction, rough grading, and final grading X X X X X X X X <br />Drilling and blasting X X X X X
The URL can be used to link to this page
Your browser does not support the video tag.