My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Former Pilkington North America Site 15 Health and Safety Plan <br /> EKI B90047.00 <br /> <br />5.4 Decontamination <br />Primary Level D decontamination procedures will include: <br /> <br /> Removal of personal protective equipment, such as gloves, coveralls; <br /> Washing of sampling equipment with distilled water and Liquinox solution; and <br /> Brushing, vacuuming, steam‐cleaning, or high‐pressure washing drilling or excavation <br />equipment. All steam‐cleaning or high‐pressure washing will be conducted in an area <br />where steam‐cleaning water will be contained in 55‐gallon drums for subsequent <br />characterization and disposal. <br /> <br />If Level C personal protection is required, minimum decontamination procedures associated with <br />Level C protection will be established and followed within the CRZ. These procedures are the <br />same for Level D, but also include the following: <br /> <br /> Removal of proper personal protection equipment followed by removal of the air <br />purifying respirator; <br /> Decontamination procedures (as described above) and preliminary respirator cleaning <br />using “wipes”; <br /> Washing of boots and equipment prior to leaving the CRZ; and <br /> Bagging and disposal of respirator cartridges and personal protection equipment at the <br />end of each day. <br /> <br />If Level C personal protection is required, reusable personal protective equipment and sampling <br />equipment will be decontaminated by washing the equipment with a trisodium phosphate <br />solution and rinsing with deionized water. A decontamination a rea will be set up within the CRZ, <br />and visqueen will be put down beneath the area to contain any fluids generated during <br />decontamination activities. All fluids and disposable equipment will be properly contained in <br />labeled drums and disposed after appropriate characterization. <br /> <br />If an injury occurs to personnel who are in Level C protection, decontamination procedures will <br />be followed to the extent reasonable based upon the nature of the injury. <br /> <br />Vehicles and Large Equipment: The decontamination process, to be implemented by the <br />Contractor, will include the removal of accumulated dirt and other contamination from the <br />vehicles and equipment while said vehicles and equipment remain in the established <br />decontamination zones and before exiting to support zones or public streets. Vehicles operated <br />by EKI or EKI subcontractors within any established EZ or CRZ at the Site will be decontaminated, <br />as needed, consistent with the requirements of the Contractor.
The URL can be used to link to this page
Your browser does not support the video tag.