Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for STOCKTON FOOD AND GAS as of December02 , 2022 . <br /> Open violations from June 29, 2022 inspection <br /> 0 This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Acer, 5u &" i +00 4 AVS'kk6ble � n <br /> Violation #206 - Failure to have a current UST Response Plan available on site. <br /> OBSERVATION An approved copy of the response plan was not available for inspection . <br /> REGULATION GUIDANCE: A copy of this plan shall be accessible on site at all times . <br /> CORRECTIVE ACTION : Immediately locate and retain a copy on site . <br /> O This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : /C{n v fh�� ,}#'� le+ <br /> ye , <br /> Violation #208 - Failure to comply with the designated operator inspection requirements . <br /> OBSERVATION The designated operator inspections for the following months were performed more than 30 days <br /> after the previous inspection : <br /> - Initial inspection on 12/ 17/2021 , next inspection performed on 2/ 11 /2022 (56 days ) <br /> REGULATION GUIDANCE: The designated operator visual inspections shall be conducted within 30 days or less of <br /> the previous inspection . <br /> CORRECTIVE ACTION : Ensure that all designated operator inspections are performed within the required time <br /> frames. <br /> ---------------------------- <br /> OBSERVATION Designated operator reports were not signed within the required time frame . <br /> -The 3/11 /2022 designated operator report was not signed by the owner/operator. <br /> REGULATORY GUIDANCE Within 48 hours of the completion of the designated UST operator visual inspection , <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report, the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues . <br /> CORRECTIVE ACTION : Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future . <br /> Page 3 of 4 <br />