Laserfiche WebLink
4"COAXIAL"UPP"REMOTE FILL OR PIPING(TYP)139 76 4'BONGED FITTING <br /> 31 SUMP SENSOR(SEE NOTE#3) <br /> 5,4 TEST REDUCER FITTING 136 204 3"EZ-F X FEMALE GLUE PIPE FOR FIBERGLASS PIPING <br /> (ttP.) 125 1164 OVER 3"ERP VAPOR <br /> RECOVERY PIPING(EYP) S <br /> PRIMARY COUPLING(IYP.)141 ' 75 4"BONDED FInING(TRP) `Q <br /> 4"MALE TERMINATIDN 138 / <br /> FITTING(YP.) N j Z W <br /> 3"x18"FLEXIBLE CONNECTOR W/EZ-FIT 41 2J 4"X4"X3"EXTRACTOR N 0 Z W <br /> MALE X EZ-FT FLANGE(SEE NOTE#1 O) e ® TEE FITTING J F F Q Z <br /> 2"EZ-FIT%MALE HER ADAPTER(IYP.)2B3 4 <br /> 97 SUMP FLAME ARRESTOR RN Q JSJ V <br /> 3"EZ-FIT COMP W/200 a Y Q It Q <br /> NITON SEAL(_P O®® q 54"DOUBLE WALL r Z (f FJ CU1Sz <br /> 12 I- _ POLYSIDED FIBERGIASS Q Q <br /> _ CONTAINMENT SUMP RE`3 r ?�2 <br /> 3"EZ-FIT 90 DEGRE 201 a li 3 p R-O <br /> ELBOW C—) a a h r r BIB <br /> Ln U <br /> Z <br /> T5- a <br /> AT 87 OCTANE TANK$2 ONLY a <br /> 3"BONDED FITTING(iYP.)73 m o m F z <br /> Z <br /> 3'OVER 2"SUMP CROSSOVER ERP 110 gQ� r a Q <br /> PIPING W/OROMMETED END CAP TO ]2 3'BONDED FITTING <br /> CONTAIN VACUUM TUBING ONLY(lP)116 <br /> 1"FRP BONDED CDNDNIT to G ADDITIVE PIPE <br /> PENETRATION FITTING(TYP.)J1 T5- CONNECTION <br /> 3/4"X 15"FLEXIBLE CONNECTOR 45 4"COAXIAL"UPP"REMOTE FILL <br /> 139 PRODUCT PIPING(EYP.) <br /> Fill Sump and Hydrostatic Reservoir Plan View(Gasoline Tanks) Nor USED NOT USED <br /> T5- SCALE:1"=1'-0" TS' SCALE:NONE TS' SCALE:NONE <br /> 4 <br /> MAINTNN 5"MIN.6"MAX.CLEARANCE <br /> BETWEEN TOP OF CAP AND GRADE. 3]ACCESS MANHOLE <br /> (SEE NOTE('4) 1B. 10"ABSOLUTE MIN, <br /> 4"PRODUCT ID,TAG, US NCE TO TOP EDGE <br /> RECESSED FLUSH W/CONC.12 MIN.NP. OF SUMP NECK J N <br /> (FEE.) 2'CROWN SEE Q <br /> N¢ <br /> BRINE SUMP RESERVOIR < • l 3 <br /> &HYDROSTATIC SENSOR 26 MANOMETER&HDPE TUBING TO TEST Q <br /> MONITOR CAP&TRAP PORT FOR CONTINUITY TESTING 7 <br /> DOOR PER GARB VR-t 02 00TELB-CUT(LENGTH AS NEEDED) 8 SZ!O <br /> 4"FACE SEAL ADAPTER 80 NIPPLE BY G.C. <br /> a(2)1"&(2)4"OND CLAMPS COUPLER(BY GG) <br /> W/#6 BARE SOLID --(3D SUMP FIVE ARRESTOR(,P.) <br /> 54'DW CIA.SUMP 4 <br /> 64 MOUNT FOOT-STEP TO RISER <br /> EXPLOSION PROOF ELEGTRIGAL,SEAL-OFF,6"ABOVE HIGHEST JO 4"5.5,IRON RISERS(SEE NOTE$9) }s <br /> PENETRACEDN(TYP.SEE NOTE((7) <br /> Mo <br /> UNT FOOT-STEP TO 64 CONTRACTOR SUPPLIED UNISTRUT& <br /> CLAMPS FORIT SUPPORT. <br /> RISER(ttP.2) ATTACH TO RISER SER WITH U-BOL) <br /> VACUUM TUBING ROUTED - CLAMP.(NP.®ALL CONDORS) <br /> TO DEVICES MONITORED <br /> IN FILL SUMP(tt, 1" 71 (34- I 4"COAXIAL"BPP"REMOTE FILL <br /> P.) I VAPOR RETURN PIPING(TYP) <br /> 4"COAXIAL"UPP"REMOTE <br /> CAD WELD TD MAIN I 134 FILL PRODUCT PIPING(TYP) <br /> ROUTE TOOOGROUND <br /> GUN WIRE. 1"30 <br /> C ROD 1 TPNK TOP(FEE.) <br /> JACK SCREW <br /> JA BO <br /> I <br /> DROP TUBE W/OVERFILL PREVENTION <br /> VALVE SET®959"CAPACItt.TERMINATE 15 SUMP o <br /> DROP TUBE MIN.4".MAX.6"ABOVE 31 27 4"x4"x3"EXTRACTOR TEE <br /> SENSOR FITTING(TYP.) �/WLpO,Uss f . <br /> STRIKER PLATE(TYP.SEE NOTE#5) NOTE:THE EQUIPMENT DEPICTED AND LISTED ABOVE IS <br /> 1/4"DRAIN/TEST BUSHING. IN ACCORDANCE WITH CARE EXECUTIVE ORDER VR-102 <br /> FACTORY INSTALLED FOR STAGE I ENHANCED VAPOR RECOVERY(EVR) <br /> Fill Sump Installation Detail rD� NOT USED NOT USED <br /> T5- _ - T5- SCALE:NONE T5- SCALE:NONE <br /> Sheet Notes t <br /> 1.-PIPE k CONDOR PE F TIHE LAN ALL HTHESS.ALL HIRING, I ml <br /> CONOUE ANG GROUNDSTTWATPENETRATE THE SUMPE 1111S SHALL BE SSIDE WALLS MUST BEATED WITH DOUBLEE BULKHEAD EALED INFSUMPS.SUMPS SHALL BE"LlHYOROSTATICALLYIEIPENI reTESTED WDUMPRH STWALLANDI.WATEENSURER FOTHERRA PERIOD OE 24 HOURSOF ALL llLKHEAN TO INSURE EBA,'HESSUMPSAND RESULTANT WATER ARE <br /> WATERTIGHE. " <br /> 2-PIPING TESTING B gg <br /> TESTING OF THE SECONDARY CONTAINMENT PIPING IS REQUIRED.THE CONTAINMENT TERMINATION FITTING IN THE SUMP IS TO BE INSTALLED WITH THE VALVE TURNED DOWN.TEE PIPING IS TO BE CONTINUOUSLY MONITORED BY VACUUM,PRESSURE OR <br /> 3.-SUMP SATCOR6EREFORE THE VALVE UNLESS BEING TESTED SHOULD REMAIN CLOSED. a <br /> ENS <br /> SENSOR TO BE MOUNTED AT SIDE OF TANK WHERE VENT/VAPOR PIPING PENETRATES INTO THE SUMP IS MADE AND BELOW LOWEST PENETRATION FITTING WITHIN SUMP AREA.MOUNT SENSOR FLUSH <br /> TO LOWEST POINT IN SUMP BOTTOM.ALL TANK SUMP SENSORS SHALL BE NON-DISCRIMINATING AND POSITION SENSITIVE. <br /> a.-IT AND N.1 N CAP HEIGHT To crenOE l �z. ELL x VALE,wPTER mI=.) <br /> THIS DIMENSION IS CRITICAL AND RADE: ADHERED T0.COMRACTOR WILL BE REpUIREO TO REINSTALL AT OWN E%PENSE OR WILL BE BACK CHARGED FOR E%PENSE i0 CORRECT INCONSISTENCIES. E <br /> 5.-DROP TUBE CRITICAL DIMENSION: xofn mTwc Ovv) q <br /> CRITICAL AND MUST BE ADHERED TO.CONTRACTOR WILL BE REQUIRED TO REINSTALL AT OWN EXPENSE OR WILL BE BACK CHARGED FOR EXPENSE TO CORRECT INCONSISTENCIES. n/a'a-war——eo aj$ <br /> 6.-MANHOLEECEO_ <br /> aDomv[nawcP(nP) <br /> ALL MANHOLE OPENINGS ON THE TANK SLAB SHALL BE INSTALLED WITH A 2"X 18"RUN CROWN OF CONCRETE i0 PREVENT WATER INTRUSION IWO THE MANHOLE. <br /> I t a'MER z <br /> 7.-U.c.CONDurt: _ g 3 <br /> a/4's.s.RlHETTN. W <br /> ALL U.G.CONDUIT TO TANK SUMPS SHALL BE ROBROY RIGID STEEL PVC COATED SCHEDULE 40 NO SUBSTITUTIONS).CONDUIT MINIMUM BURY DEPTH IS 24"PER CODE.ALL JUNCTION BOXES SHALL g <br /> BE CLASS 1 DIV.2 RATED.ALL ELECTRICAL CONDOR IN SUMPS SHALL INCLUDE A SEAL-OFF ENTERING AND LEAVING.SEAL-OFFS SHALL BE INSTALLED fi"MIN.ABOVE HIGHEST PENETRATION IN SUMP. 'x a/a'I1[0 R[oucu <br /> UR- <br /> C-FILL&VAPOR RISER GROUNDING: 3/<'THBFanco ROL pp <br /> FILL AND VAPOR RISERS SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE.SEE DETAIL E ON SHEET E-4 FOR RISER GROUNDING DETAIL 5 apa' s'1-1- <br /> ALL <br /> 3/.'�-...�.w�60 �3 <br /> 9.-STAINLESS STEEL FITTINGS: ewxa/.RY nxuxEx 'I I � <br /> CONTRACTOR TO PROVIDE ALL MISCELLANEOUS NPT FITTINGS AND NIPPLES FOR CONNECTIONS TO TURBINES,SIPHON SYSTEM x X a/4 TTP susxix�53 <br /> AND VAPDR RECOVERY SYSTEM.ALL STANLESS STEEL FITTINGS SHALL BE MANUFACTURED BY"STANDARD PIPE PROCUCIS" <br /> OR EpUAL SPECIFICATIONS AS FOLLOWS: .5 <br /> 5.5.FITTINGS CIMEN810N5 MATERIAL THREAC PRESSURE RATING z NPT FU <br /> (TEES,ELBOWS) <br /> CUSS 150/PN 20 ASME 318.3 ASTM A-182 ASIDE PH 20.1 ASME 816.3 <br /> 5.5.UNIONS <br /> CUSS 15D/PN 20 ASME 316.39 ASTM A-102 ASME B.1 20.1 ASME 816.3 \ <br /> S.S.PIPE a/aµls B.EU.rnN-.WTuw s' a/q�THRES-awc <br /> CUSS 15D/PN 20 ASTM A733 ASTM A-312 ASME CH 20.1 ASME 316.3 m mmu El-—TD L[xcix) <br /> 10.-GDRRDSION PROOF: �Gaaoline Side Sump Section Detail For Additive Automation <br /> Sump Section Detail For Additive Automation <br /> ALL TURBINE PUMP HEADS TO HAVE ADVANCED CORROSION PROOF PROTECTION WITH E-COATED FINISH. T� SCALEBCALE:1�=1-01-0 r25 <br /> F <br />