Laserfiche WebLink
Item No. 5 <br /> PC: 3-19-87 <br /> SU-87-7 <br /> Page 10 <br /> c. Fire Hydrants: Hydrants installed shall conform to the <br /> Standard American Water Works Association. They shall <br /> have two 2-34 inch outlets, one 4-% inch pumper outlet, and <br /> one 6-inch street main connection properly valved. A gate . <br /> valve shall be provided between hydrants and street mains. <br /> Hydrants shall be of a design that if the hydrant is bro- <br /> ken off, the hydrant will remain closed. <br /> d. Hydrant Spacing: Hydrants shall not be distributed more <br /> than 400 feet apart or more than 200 feet from the <br /> building to be protected. <br /> e. Engineering Plans: An engineered plan showing mains, <br /> valves, and hydrants shall be submitted to the Woodbridge <br /> Rural Fire Protection District for approval prior to <br /> installation of the system. <br /> f. Streets: All streets and water systems are to be in place <br /> and operating prior to the start of construction. <br /> 5 . Pacific Gas & Electric Company: <br /> Ten-foot-wide public utility easements shall be provided on <br /> all street frontages within the subdivision and shall be <br /> dedicated when the final map Ys. filed. . <br /> 6. Building Inspection Division: <br /> a. A grading permit will be required for the excavating or <br /> filling of earth .material . <br /> b. A grading plan shall be submitted to the Building <br /> Inspection Division and shall contain the information <br /> listed in the U.B.C. , Appendix, Chapter 70, Section <br /> 7006( 1) . <br /> c. The grading plan shall include complete drainage details <br /> and elevations of the adjacent parcels. Retaining wall <br /> details shall be submitted where applicable. <br /> d. Subdivision grading in excess of 5,000 cubic yards shall <br /> comply with Section 7014 for "Engineered Grading <br /> Requirements. " <br /> e. All recommendations of the soils engineer shall be incor- <br /> porated in the grading plans. <br /> f. All compaction reports must be submitted prior to issuance <br /> of a building permit . <br />