My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004228
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
26820
>
2600 - Land Use Program
>
PA-0300476
>
SU0004228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 7:06:23 PM
Creation date
6/7/2022 9:46:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004228
PE
2632
FACILITY_NAME
PA-0300476
STREET_NUMBER
26820
Direction
S
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/14/2004 12:00:00 AM
SITE_LOCATION
26820 S HANSEN RD
RECEIVED_DATE
9/15/2003 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Rick Griffin, (209) 468- <br /> 3154 ) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING <br /> PERMIT'. The Site Plan required as a part of the building permit must be prepared <br /> by a registered civil engineer or licensed architect. This Plan must show outdoor <br /> pallet storage areas, pallet repair area, office, any other structures, drainage, <br /> driveway access details including gates, on-site parking, landscaping, signs, <br /> existing and proposed utility services, and grading (refer to the "SITE PLAN CHECK <br /> LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for a pallet repair facility to consist of a 1,749 <br /> square-foot office, a 3,000 square-foot covered pallet repair area, and outside <br /> storage of pallets as shown on the Site Plan dated January 16, 2004. (Use type: <br /> General Industrial-Intermediate) <br /> c. COMPLIANCE DATE: Because this development is currently operating without the <br /> required permits, the following time frame shall apply: <br /> (1) An Improvement plan shall be submitted within thirty (30) days from the date of <br /> approval. <br /> (2) The improvement plan and building permit shall be secured (issued) within sixty <br /> (60) days from the date of approval. <br /> (3) All Conditions of Approval shall be completed within 180 days from the issuance <br /> of the building permit. <br /> d. BUSINESS LICENSE: The applicant shall secure an approved Business License <br /> prior to the initiation of the use. The Business License may be applied for <br /> concurrently with the building permit application. (Section 7-1000 of the County <br /> Ordinance Code) <br /> e. STORM DRAINAGE: Stormwater drainage shall be retained on-site. The drainage <br /> pattern and corresponding storm drain improvements shall be shown on the Site <br /> Plan. Drainage calculations prepared by a registered civil engineer or architect <br /> shall be included. (Development Title Section 9-1135) <br /> f. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and <br /> permanently maintained with base material of appropriate depth and asphalt <br /> concrete or Portland cement concrete to provide a durable, dust free surface. <br /> Bumper guards shall be provided when necessary to protect adjacent structures <br /> or properties. (Development Title Section 9-1015.5[e]) <br /> (2) Storage areas shall be surfaced with a minimum 4-inch aggregate base. <br /> (3) A minimum of 17 parking spaces shall be provided, including one accessible <br /> space, which shall be van accessible. Accessible spaces shall be located as <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.