My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 2:40:32 PM
Creation date
6/8/2022 3:41:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� Site: <br /> /- _�/c,.�- Aird <br /> Appendix B Date: a- <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet Tank ID l Tester <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: :- <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube. <br /> (D)= 1(6(� w_ <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower rttube,valve length. (D) <br /> (W) = I Z Upper <br /> (U)= i 7 Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note: If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension }° <br /> (OPW 6111 &61 TP models add 0.6") (W)Valve <br /> (B)_ g" ,_ Length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number(Y)which corresponds <br /> to the 100%volume. (B) <br /> (Y)_ <br /> To Tank <br /> i 1A <br /> (Y) <br /> 1. To determine shut-off percentage: Tank <br /> Subtract upper tube length (D)from distance to tank (U)Valve Chart <br /> bottom (B) Length, 100% <br /> (X) =(B) —(D)-2"_� J!j" top of cut Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X)dimension and the 100%volume(Y)tank <br /> capacity. <br /> (X)tank capacity in gallons= r <br /> (Y)tank capacity in gallons= <br /> 50%=(X)capacity/(Y)capacity x100= Vi� <br /> Note: The overfill valve must be installed per AHJ require- <br /> ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.