Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> using an open space or conservation zoning <br /> designation or easement;or recording a <br /> reinternment document with the county in <br /> which the property is located(AB 2641).Work <br /> cannot resume within the no-work radius until <br /> the lead agencies,through consultation as <br /> appropriate,determine that the treatment <br /> measures have been completed to their <br /> satisfaction. <br /> Geology and Soils <br /> 4.9.5a: Worker Awareness Training Action: Project Paleontologist San Joaquin County <br /> A professional paleontologist shall provide the Worker awareness <br /> construction crew with a pre-construction training. <br /> orientation and training on the significant <br /> paleontological resources that may be Timing: <br /> encountered and the appropriate procedures Prior to Initials Initials <br /> to follow should any be unearthed. construction. <br /> Date Date <br /> 4.9-5b: Unanticipated Discovery of Action: Project Paleontologist San Joaquin County <br /> Paleontological Resources. <br /> Paleontological <br /> If subsurface deposits believed to be resources <br /> paleontological in origin are discovered during monitoring. <br /> construction,all work shall halt within a 50-foot <br /> Timing: <br /> radius of the find until a professional <br /> Initials Initials <br /> paleontologist has assessed it and,if deemed During <br /> significant,salvaged the fossil(s)in a timely construction. <br /> manner.A plan for monitoring and fossil Date Date <br /> recovery must be completed and implemented <br /> before ground-disturbing activities can <br /> Section 1.0 Introduction 16 August 2022 <br />