Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> recommence in the area of the fossil find to <br /> allow for the recovery of the find.Salvaged <br /> fossils shall be deposited in an appropriate <br /> repository,such as the UCMP,where they will <br /> be properly curated and made available for <br /> future research. <br /> Greenhouse Gas Emissions <br /> 4.10-1a: Provide Onsite Renewable Action: San Joaquin County San Joaquin County <br /> Energy Production <br /> Onsite renewable <br /> The Project shall provide onsite renewable energy production. <br /> energy production generation comprising at <br /> least 20 percent of the Project energy demand. Timing: <br /> The County shall verify compliance with this During review of Initials Initials <br /> measure within the Project building plans and building plans. <br /> site designs prior to the issuance of building <br /> permit(s)and/or site plans(as applicable).The <br /> County shall verify implementation of this <br /> measure prior to the issuance of Certificate(s) Date Date <br /> of Occupancy. <br /> 4.10-1b: Provide Electric Vehicle Charging Action: San Joaquin County San Joaquin County <br /> Stations <br /> Onsite electric <br /> The Project shall meet the charging vehicle charging. <br /> installation/charging ready requirements of the <br /> CALGreen Code.The Project Proponent shall Timing: <br /> 1 p Initials Initials <br /> include EV charging accommodations as During review of <br /> specified in the CALGreen Code in building building plans. <br /> plans for review and approval by the County, <br /> prior to commencement of Project Date Date <br /> construction. <br /> Section 1.0 Introduction 17 August 2022 <br />