Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> Hazards and Hazardous Materials <br /> 4.11-1a: Hazardous Substance Action: Project San Joaquin County <br /> Management,Handling,Storage,Disposal, Prepare a Applicant/Construction <br /> and Emergency Response Plan. Hazardous Contractor <br /> In order to reduce the risk of accidental Emergency <br /> release of hazardous materials during Response Plan. <br /> construction activities at the site,which release <br /> is not foreseeable or anticipated,the applicant Timing: Initials Initials <br /> shall prepare and implement during all Prior to <br /> construction activities a hazardous substance construction. Date Date <br /> management,handling,storage,disposal,and <br /> emergency response plan.A hazardous <br /> materials spill kit shall be maintained on site <br /> for small spills.Additionally,the applicant shall <br /> monitor all contractors for compliance with <br /> applicable regulations, including regulations <br /> regarding hazardous materials and hazardous <br /> wastes, including disposal.Hazardous <br /> materials shall not be disposed of or released <br /> on the ground,in the underlying groundwater, <br /> or any surface water.Totally enclosed <br /> containment shall be provided for all trash.All <br /> construction waste,including trash and litter, <br /> garbage,other solid waste,petroleum <br /> products,and other potentially hazardous <br /> materials,will be removed to a waste facility <br /> permitted to treat,store,or dispose of such <br /> materials. <br /> 4.11-2a: Maintain Appropriate Setbacks Action: Project Applicant San Joaquin County CaIGEM <br /> from the"North Stockton Unit A"1 Well, Mitigate potential <br /> Confirm the Integrity of Existing <br /> Abandonment,and Monitor the Well in impacts related to <br /> Perpetuity <br /> Section 1.0 Introduction 18 August 2022 <br />