Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> standards or identifying corrective actions if <br /> any exceedances are identified. <br /> Transportation <br /> 4.19-1a: Provide Curb,Gutter and Action: Project Applicant San Joaquin County <br /> Sidewalk Between the Project Site and <br /> Eight Mile Road Construct a curb, <br /> gutter,and <br /> The applicant shall construct curb,gutter and sidewalk. Initials Initials <br /> sidewalk along the east side of West Lane <br /> between the southern edge of the project site Timing: <br /> and Eight Mile Road. County of San Joaquin During the <br /> staff has determined that County-owned right- construction period. <br /> of-way is approximately 110 feet wide along Date Date <br /> this portion of West Lane. A preliminary <br /> assessment indicates this right-of-way width is <br /> adequate to construct curb,gutter and <br /> sidewalk. <br /> 4.19-1b: Provide On-and Offsite Bicycle Action: Project Applicant San Joaquin County <br /> Facilities <br /> Provide on-and <br /> The applicant shall implement the following to offsite bicycle <br /> ensure adequate provision of bicycle facilities. facilities. <br /> On-Site Bicycle Facilities. The applicant shall Timing: Initials Initials <br /> provide on-site facilities supporting the use of <br /> bicycles.These facilities shall include secure During the <br /> construction period. <br /> bicycle parking in close proximity to proposed <br /> structures,and onsite bicycle paths or bicycle <br /> lanes connecting to the proposed bicycle Date Date <br /> facilities on West Lane. <br /> West Lane Driveway Connection. The <br /> connection of the Project site driveway to West <br /> Lane shall be designed to facilitate and protect <br /> Section 1.0 Introduction 21 August 2022 <br />