Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> bicycle travel. Design features should include <br /> striping to guide bicycles across the driveway <br /> and signage to advise motorists of the bicycle <br /> crossing(similar to a typical Class I I bicycle <br /> lane crossing a right turn lane at an <br /> intersection). The Project site driveway shall <br /> be constructed to provide for future installation <br /> of planned bicycle facilities along the west side <br /> of West Lane. The project site driveway shall <br /> be designed to facilitate the future construction <br /> of a buffered Class 2 bicycle lane along the <br /> west side of West Lane. <br /> 4.19-1c: Conduct improvements to the Action: Project Applicant San Joaquin County <br /> Eight Mile Road/SR 99 West Frontage Road Conduct road <br /> Intersection <br /> improvements. <br /> The Project applicant shall provide fair share <br /> funding for the following improvements to the Timing: <br /> Eight Mile Road/SR 99 West Frontage Road As directed by Initials Initials <br /> intersection. County of San <br /> • Signalize the intersection. This Joaquin <br /> intersection meets peak hour signal Development <br /> warrants. Services Division. <br /> Date Date <br /> • Improve the eastbound approach to <br /> include an exclusive left-turn lane, <br /> an exclusive through lane,and an <br /> exclusive right-turn lane. <br /> • Improve the westbound approach to <br /> include an exclusive left-turn lane, <br /> an exclusive through lane,and an <br /> exclusive right-turn lane. <br /> 4.19-1d: Conduct improvements to the Action: Project Applicant San Joaquin County <br /> Eight Mile Road/SR 99 East Frontage Road Conduct road <br /> Intersection <br /> improvements. <br /> Section 1.0 Introduction 22 August 2022 <br />