Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> Development <br /> Services Division. <br /> 4.19-1f: Provide a Designated On-Site Action: Project Applicant San Joaquin County SJRTD <br /> Public Transit Facility <br /> On-site public <br /> The applicant shall provide a designated transit facility. <br /> onsite public transit facility.This facility shall be <br /> designed to be accessible to public agency <br /> vehicles and vehicles operated by private or Timing: Initials Initials <br /> non-profit entities and social service providers. <br /> The onsite public transit facility shall be During the phase 2 <br /> located near the Phase 2 medical office construction period. <br /> building and hospital because these facilities <br /> generate more than 90 percent of overall Date Date <br /> Project trips. In addition,the applicant shall <br /> coordinate with SJRTD and private and non- <br /> profit organizations to encourage the use of <br /> public transit when traveling to the project site. <br /> 4.19.1g: Eliminate Sidewalks Along the Action: Project Applicant San Joaquin County <br /> Ham Lane Driveway <br /> Revise Project site <br /> The applicant shall revise the project site plan plan <br /> to eliminate sidewalks along the Ham Lane Timing: <br /> driveway until such time that sidewalks are Initials Initials <br /> provided on Ham Lane between Eight Mile Prior to and during <br /> Road and the Ham Lane driveway entrance. the construction <br /> Pedestrians should be encouraged to use the period. <br /> Date Date <br /> West Lane access route until Ham Lane and <br /> the Ham Lane entrance driveway sidewalks <br /> are constructed.This shall be memorialized in <br /> the Development Agreement or as a Condition <br /> of Approval. <br /> Section 1.0 Introduction 24 August 2022 <br />