Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> The Project applicant shall provide fair share Timing: <br /> funding for the following improvements to the As directed by <br /> Eight Mile Road/SR 99 East Frontage Road Initials Initials <br /> intersection. County of San <br /> Joaquin <br /> • Signalize the intersection. This Development <br /> intersection meets peak hour signal Services Division. <br /> warrants. Date Date <br /> • Improve the eastbound approach to <br /> include an exclusive left-turn lane, <br /> an exclusive through lane,and an <br /> exclusive right-turn lane. <br /> • Improve the westbound approach to <br /> include an exclusive left-turn lane, <br /> an exclusive through lane,and an <br /> exclusive right-turn lane. <br /> • Change the lanes on the <br /> northbound approach. Change the <br /> approach lanes from a northbound <br /> combined through/left-turn lane and <br /> an exclusive northbound-to- <br /> eastbound right-turn lane,to an <br /> exclusive northbound-to-westbound <br /> left-turn lane and a northbound <br /> combined through/right-turn lane. <br /> 4.19-1e: Conduct improvements to the Action: Project Applicant San Joaquin County City of <br /> segment of Eight Mile Road Between Lower Conduct road Stockton <br /> Sacramento Road and West Lane <br /> improvements. <br /> The Project applicant shall provide fair share <br /> Initials Initials <br /> funding for the following improvement to the <br /> segment of Eight Mile Road Between Lower Timing: <br /> Sacramento Road and West Lane. <br /> As directed by <br /> • Widen this roadway segment from County of San Date Date <br /> two lanes to four lanes. Joaquin <br /> Section 1.0 Introduction 23 August 2022 <br />