Laserfiche WebLink
Section 1.0 Introduction 5 August 2022 <br />Implementation <br />Actions and <br />Implementation <br />Responsibility for Oversight <br />Agency <br />Comments <br />Mitigation Measure <br />Timing <br />Responsibility <br />of Compliance/ Verification <br />Coordination <br />applicable fees, before issuance of the first <br />building permit. <br />Based on the findings of the air impact <br />assessment, the applicant shall pay the <br />SJVAPCD a monetary sum necessary to offset <br />the required operational emissions that are not <br />reduced by the emission reduction measures <br />contained in the air impact assessment. The <br />quantity of operational emissions that need to <br />be offset will be calculated in accordance with <br />the methodologies identified in Rule 9510, <br />Indirect Source Review, and approved by the <br />SJVAPCD. Operational emissions reduction <br />methods will be selected under the direction of <br />the SJVAPCD according to the air impact <br />assessment process detailed in, and required <br />by Rule 9510, Indirect Source Review (see <br />Rule 9510, subsection 5). <br />Biological Resources <br />4.6-1 a: Conduct Environmental <br />Action: <br />Project Biologist/ <br />San Joaquin County <br />Awareness Training for Construction <br />Environmental <br />Construction Contractor <br />Personnel. <br />Awareness <br />Before any construction work occurs on the <br />Training for <br />Project site, including grading, tree and/or <br />construction <br />vegetation removal (clear and grub), the <br />personnel. <br />Initials <br />Initials <br />County shall retain a qualified biologist <br />Timing: <br />(familiar with the resources in the area) to <br />conduct a mandatory contractor/worker <br />Prior to <br />environmental awareness training for <br />Construction. <br />construction personnel. The awareness <br />Date <br />Date <br />training will be provided to all construction <br />personnel (contractors and subcontractors) <br />prior to beginning construction to brief them on <br />Section 1.0 Introduction 5 August 2022 <br />