Laserfiche WebLink
Section 1.0 Introduction 6 August 2022 <br />Implementation <br />Actions and <br />Implementation <br />Responsibility for Oversight <br />Agency <br />Comments <br />Mitigation Measure <br />Timing <br />Responsibility <br />of Compliance/ Verification <br />Coordination <br />the need to avoid effects on sensitive <br />biological resources adjacent to construction <br />areas and the penalties for not complying with <br />applicable state and federal laws and permit <br />requirements. The biologist will inform all <br />construction personnel about the life history <br />and habitat requirements of special -status <br />species with potential for occurrence onsite, <br />the importance of maintaining habitat, and the <br />terms and conditions of required permit <br />conditions. The environmental training will also <br />cover general restrictions and guidelines that <br />must be followed by all construction personnel <br />to reduce or avoid effects on sensitive <br />biological resources during project <br />construction. <br />4.6-1 b: Install Fencing and/or Flagging to <br />Action: <br />Project Biologist/ <br />San Joaquin County <br />Protect Sensitive Biological Resources. <br />Install fencing <br />Construction Contractor <br />Prior to construction, the construction <br />and/or flagging. <br />contractor shall install high -visibility orange <br />Timing: <br />construction fencing and/or flagging, as <br />appropriate, along the perimeter of the work <br />Prior to <br />Initials <br />Initials <br />area when adjacent to Environmentally <br />construction. <br />Sensitive Areas (ESAs) (e.g., special -status <br />species habitat, and active bird nests, native <br />Date <br />Date <br />oaks, and surface water features). The County <br />will ensure that the final construction plans <br />show known locations where fencing will be <br />installed (such as along the Woodbridge <br />Irrigation Canal southern bank). The plans <br />shall also define how to locate appropriate <br />ESA fencing which shall include all locations <br />identified on the plans and additional locations <br />identified by a qualified biologist as part of an <br />initial field walk with the lead contractor. This <br />may result in identification of ESAs within the <br />Section 1.0 Introduction 6 August 2022 <br />