Laserfiche WebLink
Section 1.0 Introduction 7 August 2022 <br />Implementation <br />Actions and <br />Implementation <br />Responsibility for Oversight <br />Agency <br />Comments <br />Mitigation Measure <br />Timing <br />Responsibility <br />of Compliance/ Verification <br />Coordination <br />northern buffer that require protection (based <br />on final planting and drainage plans). The <br />contractor shall ensure ESA fencing is <br />maintained throughout the duration of the <br />construction period. If the fencing is removed, <br />damaged, or otherwise compromised during <br />the construction period, construction activities <br />shall cease until the fencing is repaired or <br />replaced. The project's special provisions <br />package shall provide clear language <br />regarding acceptable fencing material and <br />prohibited construction -related activities, <br />vehicle operation, material and equipment <br />storage, and other surface -disturbing activities <br />within ESAs. All temporary fencing shall be <br />removed upon completion of construction. <br />4.6-1 c: Sanford's Arrowhead. <br />Action: <br />Project Biologist <br />San Joaquin County <br />USFWS, <br />Prior to ground disturbance within the northern <br />Sanford's <br />CDFW, CNPS <br />boundary proposed 100 -foot buffer, the <br />arrowhead surveys. <br />following actions shall be implemented to <br />Timing: <br />avoid potential impacts to Sanford's <br />arrowhead. If no ground disturbance occurs <br />Prior to ground <br />Initials <br />Initials <br />within the buffer area, no mitigation is required. <br />disturbance within <br />Perform focused plant surveys <br />the Northern buffer <br />according to USFWS, CDFW, and CNPS <br />area. <br />Date <br />Date <br />protocols. Surveys should be timed according <br />to the blooming period for target species (May <br />through October) and known reference <br />populations, if available. <br />• The USFWS generally considers <br />plant survey results valid for approximately <br />three years. Therefore, follow-up surveys may <br />be necessary if Project implementation occurs <br />after this three-year window. <br />Section 1.0 Introduction 7 August 2022 <br />