Laserfiche WebLink
Section 1.0 Introduction 9 August 2022 <br />Implementation <br />Actions and <br />Implementation <br />Responsibility for Oversight <br />Agency <br />Comments <br />Mitigation Measure <br />Timing <br />Responsibility <br />of Compliance/ Verification <br />Coordination <br />suitable habitat. Relocation methods shall be <br />approved by CDFW. <br />4.6-1 e: Protect Water Quality and <br />Action: <br />Construction Contractor <br />San Joaquin County <br />Minimize Sedimentation Runoff to Non - <br />Comply with water <br />Wetland Waters (Woodbridge Irrigation <br />quality BMPs. <br />Canal). <br />Project construction shall comply with all <br />Timing: <br />Initials <br />Initials <br />construction site BMPs specified in the Storm <br />Prior to and during <br />Water Pollution Prevention Plan, and any other <br />construction. <br />permit conditions to minimize the introduction <br />of construction -related contaminants and <br />Date <br />Date <br />mobilization of sediment to non- wetland <br />waters in and adjacent to the project area. <br />These BMPs will address soil stabilization, <br />sediment control, wind erosion control, vehicle <br />tracking control, non-stormwater management, <br />and waste management practices. The BMPs <br />will be based on the best conventional and <br />best available technology. <br />4.6.1f: Giant Garter Snake. <br />Action: <br />Project Biologist/ <br />San Joaquin County <br />SJCOG <br />Prior to ground disturbance within 200 feet of <br />Avoid impacts to <br />Construction Contractor <br />the Woodbridge Irrigation District canal, <br />giant garter snake. <br />consistent with the SJMSCP, the following <br />Timing: <br />Initials <br />Initials <br />actions shall be implemented to avoid potential <br />impacts to giant garter snake: <br />Prior to ground <br />• Construction shall occur during the <br />disturbance within <br />active period for the snake, between <br />200 feet of the <br />Woodbridge <br />Date <br />Date <br />May 1 and October 1. SJCOG, with <br />Irrigation District <br />concurrence of the permitting <br />canal. <br />Agencies, shall determine if <br />additional measures are necessary <br />to minimize and avoid take for <br />construction between October 2 and <br />Section 1.0 Introduction 9 August 2022 <br />