My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
11000
>
2600 - Land Use Program
>
PA-2000014
>
SU0014991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 10:04:31 AM
Creation date
6/8/2022 4:46:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014991
PE
2677
FACILITY_NAME
PA-2000014
STREET_NUMBER
11000
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
LODI
Zip
95242-
APN
05908007, -29, -30
ENTERED_DATE
6/8/2022 12:00:00 AM
SITE_LOCATION
11000 N WEST LN
RECEIVED_DATE
6/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Measure <br />Implementation <br />Actions and <br />Timing <br />Implementation <br />Responsibility <br />Responsibility for Oversight <br />of Compliance/ Verification <br />Agency <br />Coordination <br />i <br />Comments <br />April 30. <br />• Limit vegetation clearing within 200 <br />feet of the banks of the Woodbridge <br />Irrigation District canal to the <br />minimum necessary. <br />• Where feasible, confine movement <br />of heavy equipment within 200 feet <br />of the banks of the Woodbridge <br />Irrigation District canal to existing <br />farm roads to minimize habitat <br />disturbance. <br />• Prior to ground disturbance, all <br />onsite construction personnel shall <br />be given instruction regarding the <br />presence of SJMSCP Covered <br />Species and the importance of <br />avoiding impacts to these species <br />and their habitats (Per Mitigation <br />Measure 4.6-1 a). <br />• Install temporary fencing at the edge <br />of the construction area and the <br />adjacent Woodbridge Irrigation <br />District canal southern bank (Per <br />Mitigation Measure 4.6-1b). <br />• Restrict working areas, spoils and <br />equipment storage and other project <br />activities to areas outside of the <br />proposed northern buffer area. <br />• Maintain water quality and limit <br />construction runoff into the irrigation <br />ditch through best -management - <br />practices (Per Mitigation Measure <br />4.6-1 e). <br />• A preconstruction survey for giant <br />garter snake shall occur prior to <br />construction activities and within 24 <br />hours of ground disturbance. <br />Section 1.0 Introduction 10 August 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.