Laserfiche WebLink
Item No. <br /> PC : 12-18-86 <br /> VR-87-2/SU-87-4 <br /> Page 10 <br /> FACILITIES AND SERVICES : <br /> Sewage Disposal : <br /> Both units are to be served by the Woodbridge Sanitary <br /> District . Oversized lines were installed for Unit 2 as part of <br /> Unit 1 . <br /> Adequate treatment plant capacity has been reserved for Unit 2 . <br /> Water Supply: <br /> Water is to be supplied by the Mokelumne Acres Maintenance <br /> District from two area wells, one located at the southwest <br /> corner of the subdivision. Oversized lines are in place in <br /> Unit 1 for extension to Unit 2 . <br /> Storm Drainage : <br /> Mokelumne Acres Maintenance District will operate and maintain <br /> the terminal line system installed from the site to the <br /> Mokelumne River, 1000 feet north of the subdivision. <br /> Protective Services : <br /> The use of remote-control gates , fencing, and security person- <br /> nel will provide private security. <br /> An emergency-vehicle-only access for public police and fire <br /> protection should be established along the portion of <br /> Woodbridge Road adjoining the southwest corner of the sub- <br /> division. <br /> The Woodbridge Rural Fire District has recommended the <br /> installation of a fire protection system, as noted in the <br /> Conditions of Approval . <br /> Schools: <br /> The site is within the Lodi Unified School District . The <br /> applicant proposes to negotiate a direct fee payment agreement <br /> with the District in lieu of bedroom tax payments. A District <br /> Agreement was used for Unit 1 . <br /> Utilities: <br /> The 60-foot public utilities easements established for Unit 1 <br /> will be extended to Unit 2 . Utility providers include Pacific <br />