Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer 0✓ Industry Standard © Professional Engineer <br /> Test Type 0 Pressurex❑ Vacuum ❑I— Hydrostatic <br /> Test Equipment Used: vacuum Gage. <br /> Tank ID Gasoline -87-1 Gasoline -87-2 Gasoline-91 <br /> Tank Manufacturer Unknown (FRP) Unknown (FRP) Unknown (FRP) <br /> Tank Capacity 10,000 10,000 8,000 <br /> Test Start Time 12:00 12:00 12:00 <br /> Initial Reading 10 10 10 <br /> Test End Time 14:00 14:00 14:00 <br /> Final Reading 10 10 10 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria 0 0 0 <br /> Tightness Test Results 0✓ Pass 0 Fail ® Pass © Fail ® Pass 0 Fail ❑ Pass C Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by El Manufacturer 0 Industry Standard © Professional Engineer <br /> Test Type © Pressure 0 Vacuum © Hydrostatic <br /> Test Equipment Used: Pressure Gage <br /> Pipe Run ID Gasoline -87-1 Gasoline -87-2 Gasoline-91 <br /> Pipe Manufacturer Smith Piping Smith Piping Smith Piping <br /> Test Start Time 12:00 12:05 12:10 <br /> Initial Reading 5 5 5 <br /> Test End Time 13:00 13:05 13:10 <br /> Final Reading 5 5 5 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria 0 0 0 <br /> Tightness Test Results 0 Pass © Fail E Pass r] Fail Pass ID Fail ❑ Pass ® Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results 0 Pass 0 Fail ❑ Pass r] Fail I 0 Pass 0 Fail C Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />