Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer ❑Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: iNCON STS <br /> Sump/UDC ID 87-1 STP 87-2 STP 91 STP <br /> Sump Manufacturer Unknown (FRP) Unknown (FRP) Unknown (FRP) <br /> Sump Depth (inches) 58 59 60 <br /> Sump Bottom to Top of 4 4 4 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:27 12:27 12:27 <br /> Initial Reading 3.5930 4.1073 2.8257 <br /> Test End Time 12:42 12:42 12:42 <br /> Final Reading 3.5907 4.1067 2.8246 <br /> Change in Reading -.0023 -.0006 -.0011 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 <br /> Tightness Test Results El Pass rl Fail © Pass rl Fail r Pass © Fail [Cl Pass ❑l Fail <br /> Sump/UDC ID UDC#1-2 UDC#3-4 <br /> Sump Manufacturer Bravo (Steel) Bravo (Steel) <br /> Sump Depth (inches) 9 9 <br /> Sump Bottom to Top of Bottom Bottom <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 13:27 13:27 <br /> Initial Reading .5220 .2491 <br /> Test End Time 13:42 13:42 <br /> Final Reading .5223 .2496 <br /> Change in Reading .0003 .0005 <br /> Pass Fail Criteria +/-0.002 +/-0.002 <br /> Tightness Test Results 0 Pass 0 Fail © Pass 0 Fail r] Pass © Fail C Pass C Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />