Laserfiche WebLink
provide interim ana permanent funding for school facilities a, evidenced by certificates <br /> of compliance from these jurisdictions stating that the developer has complied with <br /> funding requirements as per the agreements. Timing: condition shall be met before <br /> approval of Final Maps <br /> 17. Neighborhood Park: The 5-acre neighborhood park shown on the Tentative Map shall <br /> be dedicated to the CSD or an offer of dedication to the CSD shall be recorded. Timing: <br /> condition shall be met before approval of first Final Map. [SPP 2.2.5 (a,b,c)] <br /> 18. Community Park/Interim Sports Fields: Interim sports fields and open play areas <br /> shall be planned and constructed by the developer or CSD with approval of the CSD. <br /> Timing: 1) prior to approval of Final Map with the 500th dwelling unit, plans for the <br /> interim sports fields and open play areas shall prepared with approval of the <br /> CSD. <br /> 2) prior to approval of Final Map with the 800th dwelling unit, the interim sport <br /> fields and open play areas shall be constructed. <br /> [MP implementation 7.2.7 c), SP 1 7.1.4 a,d)] <br /> 19. Mini-Park: A 1/2 acre area of land in the southwest sub-neighborhood shall be <br /> dedicated to the CSD upon approval of the Final Map for this area. This condition may <br /> be waived by the CSD General Manager if he determines that demand for the mini-park <br /> does not exist at a sufficient level to warrant its dedication, construction and operation. <br /> Timing: condition shall be met before approval of final map for southwest sub- <br /> neighborhood. [MP policy 7.2.11 f), implementation 7.2.11 e)] <br /> TRANSPORTATION FACILITIES <br /> 20. Mountain House Parkway Intersection Improvements: A 250 to 500 lineal feet of <br /> four-lane section, as adequate to accommodate traffic volumes, shall be provided on both <br /> the northbound and southbound approaches of Mountain House Parkway at Grant Line <br /> Road and Mascot Boulevard. <br /> Timing: annual monitoring, once the intersection level of service reaches the LOS D <br /> threshold before reaching LOS E,these improvements shall be constructed prior to the <br /> issuance of any additional residential building permits. <br /> [Mit Neg Dec mitigation TRAFFIC-21 <br /> 21. Mascot Boulevard: The intersection of Mascot Boulevard and Mountain House Parkway <br /> shall be improved to provide two northbound, left-turn lanes on Mountain House <br /> Parkway. In addition, the free-right turn recommended on the eastbound approach shall <br /> be constructed such that the traffic using this lane merges into southbound Mountain <br /> House Parkway traffic into a separate travel lane. A southbound acceleration lane located <br /> south of Mascot Boulevard shall be provided to insure a smooth and unrestricted <br /> transition onto Mountain House Parkway. To accommodate the northbound dual left-turn <br /> lanes, Mascot Boulevard shall be constructed as a four-lane facility between Mountain <br /> House Parkway and the first residential access point to the west of DeAnza Boulevard. <br /> Timing: condition shall be met be fore approval of first Final Map. <br /> [Mit Neg Dec mitigation TRAFFIC-3] <br /> 22. Temporary Turnarounds: The following streets, which are to be stubbed for future <br /> extension will require temporary turnarounds unless waived by the CSD General <br /> Manager: De Anza Blvd., Providence Street, Tradition Street, Central Parkway, and <br /> Mascot Blvd. Timing: Improvement Plans [Su 98-04 COA 1.j.] <br /> 10/05/00 4 <br />