Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> K-8 School Plans. An "Educational Specification <br /> Process" for the first K-8 school shall be completed by <br /> Lammersville Elementary School District(LESD)and <br /> the results incorporated into the first Neighborhood <br /> Center Special Purpose Plan. Furthermore,prior to <br /> preparation of a School Facilities Master Plan the <br /> LESD and Tracy Joint Union High School District <br /> (TJUHSD)shall complete an Educational <br /> Specification Process as established by the California <br /> Department of Education,to determine the design and <br /> ultimate floor plan of the K-8 and 9-12 school facilities <br /> 479 P.1.3.I.a School Facilities in Mountain House. N/A School plan has been completed. None. <br /> School Facilities Master Plan. After completion of the <br /> Education Specification Plan for the first <br /> neighborhood,but prior to submittal of the first <br /> Development Permit,the Tracy Joint Union High and <br /> Lammersville Elementary School Districts shall <br /> prepare and the County shall approve a School <br /> Facilities Master Plan for each district(in the case of <br /> Tracy Joint Union High School District,an <br /> "addendum"to their current district Master Plan shall <br /> be prepared)that addresses student needs over a ten <br /> year planning horizon. The School Facilities Master <br /> Plan shall incorporate findings from the Education <br /> Specification Process and shall develop detailed cost <br /> estimates and shall specify the schedule for the phased <br /> funding, planning,design,approvals, construction and <br /> opening of school facilities and provision of other <br /> required mitigation. It shall also address interim <br /> facilities needs prior to construction of permanent <br /> 480 P.1.3.1.b School Facilities facilities. N/A K-8 school facilities plan has been completed. None. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page108 <br />