Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Funding for interim school facilities will be provided <br /> Interim Facilities. Adequate interim facilities, to the Lammersville School Dist. The Interim <br /> including relocatable classrooms and support facilities facilities will be located at the Lammersville School(K <br /> will be provided at existing schools before the first on- 8)and the Tracy Union West High School. See school <br /> 481 P.1.3.1.c School Facilities site schools are completed. Y agreements. COA-16 <br /> School Sites. The exact size(acreage)of K-8 and 9-12 <br /> schools sites shall be determined at the point of school <br /> design. Approximate acreage and configurations are <br /> as follows: Each new K-8 site shall contain up to 16 <br /> acres in a generally rectangular shape. Each site shall <br /> be master planned to Elementary School District <br /> standards to accommodate the eventual buildout and <br /> student generation of its neighborhood(targeted to an <br /> optimum of approximately 750 K-8 students,with a <br /> maximum of 870 K-8 students per neighborhood). <br /> Each 9-12 site shall contain up to 46.5 acres in a <br /> generally rectangular shape. Each site shall be master <br /> planned according to High School District standards to The proposed K-8 school site is 15+acres in size and <br /> accommodate the eventual buildout and student has a rectangular shape. The Lammersville school <br /> generation of the six closest residential neighborhoods district shall review a master plan for the facility and <br /> (up to approximately 2,300 to 2,400 students). will determine timing of construction. There is no <br /> 482 5.1.3.I.d School Facilities Y high school proposed within Neighborhood F. COA-1, 15 <br /> Adjacent Parkland. Each new K-8 school shall have <br /> shared use of an adjacent 2.4 acres of neighborhood <br /> parkland for athletic fields. This parkland has the <br /> potential of increasing the total usable area of the <br /> 483 5.1.3.1.e School Facilities school to 18.4 acres. Y See#475. COA-17 <br /> Land. Land for schools shall be provided as described School land has been set aside for the K-8 school. See <br /> 484 5.1.3.I.f School Facilities by the Public Financing Plan. Y tentative map and project design. COA-1, 15 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page109 <br />