Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Funding. Funding sources for school facilities <br /> including interim facilities and buses at existing off- <br /> site schools shall be identified in the Public Financing <br /> 485 5.1.3.I.g School Facilities Plan. Y Public Financing Plan has been adopted None. <br /> Student Generation Rates. The second and each <br /> subsequent Specific Plan shall contain an evaluation of <br /> current student generation rates against those assumed <br /> in earlier Specific Plans. If rates are higher, more <br /> schools and facilities may be required. If they are <br /> lower, fewer students may attend each school. This <br /> data may require a revision of the School Facilities <br /> Master Plan. The land use plan containing 12 K-8 <br /> schools and 2 high schools shall not be modified to <br /> change the number of schools without a Master Plan <br /> 486 5.1.3.I.h School Facilities revision. N/A Not applicable at Tentative Map stage. None. <br /> State Funding, The Districts shall pursue State <br /> funding to the maximum extent possible after <br /> consideration of the facility phasing plan proposed in <br /> the School Facilities Master Plan and to the extent that <br /> the eligibility of existing District facilities is not <br /> 487 5.1.3.1.i School Facilities negatively impacted. N/A Not applicable to Tentative Map. None. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page110 <br />