My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> PHASING <br /> COSTS(Capital <br /> Facility Cost <br /> 657 6.12.1 and Phasing <br /> Initial fire protection will be provided either from <br /> existing Tracy Rural Fire District facilities or from <br /> interim facilities located near the community. Criteria <br /> to be used in determining the facilities timing shall <br /> include the County's General plan requirements,the <br /> Fire Protection guidelines,existing facilities and their <br /> anticipated use rates, anticipated impacts of growing <br /> traffic on response times, actual and anticipated <br /> development and the finalized locating of the various <br /> 658 6.12.I.a Police and Fire stations. Y See#550 COA-61 <br /> A temporary fire facility will be provided prior to the <br /> construction of permanent facilities. It is anticipated <br /> that the first fire station will be built when there are <br /> approximately 1,800 homes in the community and will <br /> be expanded when there are 4,200 homes and three <br /> neighborhoods developed. The first phase of the <br /> second station will be needed when there are <br /> approximately 9,400 homes in Mountain House;the <br /> facility will be expanded when 12,000 units have been <br /> 659 6.12.1.b Police and Fire built. Y See#550 COA-61 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.