My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
989 325' west <br /> 994 200' north, 315' east <br /> 995 300' west <br /> 996 200' south, 315' east <br /> 997 300' west <br /> 1002 200' north, 325' east <br /> 1003 275' west <br /> 1005 200' south, 325' east <br /> 1006 275' west <br /> 48. Non-residential parcels that are fully restricted access to adjacent streets, shall obtain <br /> access to other public streets through a minimum 30-foot wide non-exclusive access <br /> easement that connects to the other public streets. These easements shall be noted on the <br /> Final Map or parcel map of any subdivision. <br /> 49. The following minimum arterial improvements shall be constructed as part of the <br /> proposed development or the first phase of a phased development: <br /> A. All of Wicklund Crossing (Mountain House Parkway to Historic Street) <br /> improvements, including the De Anza/Wicklund Crossing Entryway. <br /> B. All of Mascot Boulevard between Mountain House Parkway and De Anza <br /> Boulevard. <br /> C. The north half plus the south half median and inside lane of Mascot Boulevard <br /> from De Anza Boulevard to the Prosperity Street entrance into the residential <br /> portion of the development. <br /> D. The south half plus the north half median and inside lane of Mountain House <br /> Boulevard from Mountain House Parkway to the Providence Street entrance into <br /> the residential portion of the development. <br /> E. The interior two lanes plus full median improvements on De Anza Boulevard <br /> north of Mountain House Boulevard, if the proposed interim or permanent fire <br /> station is located as shown on the Tentative Map. If the site for the fire station is <br /> moved to the northeast corner of Central Parkway and Mascot Blvd., the <br /> developer shall provide all weather roads to the station site from permanently <br /> constructed roads. The all weather road(s) shall be designed to the requirements <br /> of the CSD. <br /> F. Roadway, streetscape, and landscaping shall be designed consistent with the CSD <br /> Roadway Landscape Plan, the CSD Design Manual, and the Special Purpose Plan. <br /> The design plans associated with each phase of the development shall be <br /> completed and approved by the CSD General Manager prior to the approval of the <br /> Final Map for that phase. <br /> G. All of Mountain House Parkway along the entire eastern boundary of the <br /> Tentative Map shall be improved. The roadway may be constructed in phases <br /> 10 <br /> 10/05/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.