Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or`� <br /> Consis Conditions o <br /> Section tency Approval <br /> I Heading# Title Text Y/N/NAFinding <br /> y.� <br /> of Fact/Analysis and Evidence of Compliance `(COA) <br /> Railroad crossings and intersection channelization <br /> Capital Facility improvements will be constructed in response to traffic <br /> Cost and volume and circulation patterns in order to maintain <br /> 118 9.10.1.h Phasing the required level of service. N/A None. <br /> Capital Facility Table 9.8: Summary of Transportation Trigger Points <br /> Cost and summarizes the phasing information included in the <br /> 1119 9.10.1.1 PhasinO prior sections of this chapter. N/A None. <br /> Road maintenance will be provided in a manner <br /> consistent with Section 9.6 of this Master Plan, by the <br /> CSD or a special district authorized to provide this <br /> service. Maintenance will conform to applicable <br /> County standards and may be funded by a combination <br /> of existing taxes and/or new service charges. <br /> Maintenance personnel, vehicles,and equipment may <br /> be shared with other maintenance crews to increase <br /> efficiency and decrease costs. Costs associated with <br /> Operations and road maintenance are included in the fiscal analysis in <br /> 1120 9.10.2.a Maintenance the PFP. Y The CSD will perform this function. None. <br /> CHAPTER <br /> TEN: AIR <br /> QUALITY <br /> AND <br /> TRANSPORTA- <br /> TION <br /> MANAGEMEN <br /> 1121 10 T <br /> OVERALL <br /> ISSUES AND <br /> CROSS- <br /> 1122 10.2 REFERENCES <br /> 10/03/2000 MHMP.CHECKLIST-928 Page240 <br />