My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Phasing of transportation improvements will generally <br /> relate to the phasing of residential and non-residential <br /> land uses. The traffic monitoring program will result <br /> in annual updates to the Roadway Improvement Plan <br /> which will initially be prepared after approval of the <br /> Capital Facility Master Plan. Improvements will be developed on an <br /> Cost and as-needed basis to maintain the LOS standards <br /> 1 114 9.10.1.d Phasing identified in this chapter. N/A None. <br /> On-Site Roadway Circulation and Design, include <br /> anticipated start-up events for construction of freeway <br /> and Arterial improvements. On-site roadways will be <br /> phased consistent with the amount and location of <br /> Capital Facility development. Phasing of County roads will be <br /> Cost and controlled by the County and coordinated with the <br /> 1115 9.10.1.e Phasing community's Roadway Improvement Plan. N/A None. <br /> On-Site Roadway Circulation and Design, include <br /> anticipated start-up events for construction of freeway <br /> and Arterial improvements. On-site roadways will be <br /> phased consistent with the amount and location of <br /> Capital Facility development. Phasing of County roads will be <br /> Cost and controlled by the County and coordinated with the <br /> 1116 9.10.1.17 Phasing community's Roadway Improvement Plan. N/A None. <br /> Bus transit and bicycle facilities will be provided <br /> incrementally throughout buildout of the community, <br /> Capital Facility with transit stops, shelters, bicycle lockers and racks in <br /> Cost and each neighborhood. The Mococo rail platform will be <br /> 1117 9.10.1.9 Phasing built after passenger service is initiated. N/A None. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page239 <br />
The URL can be used to link to this page
Your browser does not support the video tag.